My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - USI Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - USI Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:30:52 PM
Creation date
8/23/2022 1:30:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 <br />Team Leadership <br />• Marshall County Bridge #73 <br />• Olive Street Phase I – South Bend, IN * <br />• Downtown streetscape – Delphi, IN * <br />• Gary Marina Bridge Phases I - III – Gary, IN * <br />• 169th Street Reconstruction Phases II - IV – <br />Hammond, IN * <br />• Whiting Lakeshore Park – Whiting, IN * (Included <br />a large 315’ pedestrian pier into Lake Michigan) <br />• Olive Street Reconstruction Phase I – <br />South Bend, IN <br />• Ignition Park Infrastructure Div A and B <br />– South Bend, IN * <br />• Bartlett Street Reconstruction Phase I – <br />Various Divisions – South Bend, IN * <br />• Whiting Lakeshore Park – Whiting, IN * (Included a <br />large 315’ pedestrian pier into Lake Michigan) <br />• INDOT SR 49 Bridge Deck Overlays, Bridge Painting, <br />Bridge Deck Replacements – Porter County, IN <br />• LaPorte County Bascule Bridge Maintenance Repairs <br />– Michigan City, IN <br />Scott brings nearly 28 years <br />of experience in Construction <br />Management and Inspection <br />services in Indiana. His demand for <br />quality workmanship is evident in projects <br />completed for our clients throughout those <br />years! Scott serves as USI’s Construction Services <br />Department Manager and makes sure ALL projects <br />are constructed in accordance with the plans, <br />project scope, and specifications. <br />Applying a “hands-on” approach in all responsibilities, Scott sees that all <br />decisions and communications are clear between the owner/client and <br />provides the information necessary for decisions to be made in a timely <br />fashion. As conclusions and assessments based on in-field conditions arise, <br />he coordinates all the information with the USI team. <br />Tracy is an experienced engineer <br />with 29 years in the planning, design <br />and construction observation of <br />bridge engineering projects. She is the <br />co-founder of McCormick Engineering, LLC, a firm <br />recognized by the State of Indiana as a Women’s <br />Business Enterprise (WBE) and Disadvantaged <br />Business Enterprise (DBE). She has worked with <br />both bridges and trails for many projects for both <br />INDOT and local LPA clients. <br />Justin Sherman has over 14 years of experience <br />in the construction inspection industry. He <br />will be your on-site inspector and can fill in for <br />Chris Holth whenever and wherever needed. <br />Chris and Justin have worked on 9 large INDOT LPA projects <br />together and have a great working relationship. Justin’s <br />relevant experience includes daily records, on-site testing, <br />and material record documentation. He has several INDOT <br />certifications that are helpful when erosion or utility issues arise in the field. He also has extensive <br />experience with INDOT specifications, plans, and procedures to help to deliver a seamless project. <br />*Project completed with another firm <br />Scott Dick | Project Manager <br />Tracy McCormick, PE | Inspector <br />Justin Sherman | Inspector <br />Project Experience <br />• City of Westfield - Midland Trace Trail with Pedestrian Bridge, Phase 2 <br />• City of Noblesville - White River Greenway Trail Boardwalk & Bridge Repair <br />• City of Anderson - Shadyside Trail over Killbuck Creek with Pedestrian <br />Bridge Rehabilitation <br />• City of La Porte - Stone Lakeshore Drive Trail Project <br />• Town of Avon- Ronald Reagan Parkway Trail <br />• Hendricks County - Avon Trails, Section 6-9 <br />CERTIFICATIONS <br />• INDOT Certified <br />Technician, All <br />Disciplines <br />• INDOT <br />SiteManager <br />• INDOT <br />Storm Water <br />Management <br />(Level 1) <br />CERTIFICATIONS <br />• Professional <br />Engineer <br />• INDOT Certified <br />Technician, All <br />Disciplines <br />• INDOT <br />SiteManager <br />• INDOT <br />Storm Water <br />Certification <br />CERTIFICATIONS <br />• INDOT Certified Technician, All <br />Disciplines <br />• INDOT SiteManager <br />• INDOT Storm Water <br />Management (Level 1) <br />• INDOT Utility Coordination <br />• Certified UAS Pilot <br />Christopher (Chris) Holth is a Construction Project <br />Manager and INDOT Certified Project Supervisor with <br />over 30 years of experience in the construction inspection <br />industry. He will be your lead Project Supervisor and main point <br />of contact throughout the project. His experience includes coordinating <br />project schedules, changing and designing discrepancies, and managing communication. He has <br />also managed on-site testing, mentored field inspectors, supervised the construction and budget <br />requirements, and communicated with residents, public officials, and INDOT and FHWA personnel to <br />answer project related questions and complaints. <br />Chris Holth | Project Supervisor CERTIFICATIONS <br />• INDOT Certified <br />Technician, All <br />Disciplines <br />• INDOT SiteManager <br />Project Experience <br />Project Experience
The URL can be used to link to this page
Your browser does not support the video tag.