My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:30:41 PM
Creation date
8/23/2022 1:30:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE IIB) 6 <br />Nick Smith <br />RESIDENT PROJECT REPRESENTATIVE <br />FINNIAN CAVANAUGH <br />CITY OF SOUTH BEND <br />DALE WILLS <br />FIELD SERVICE SUPPORT <br />Tracy McCormick, PE (ME) <br />INSPECTION SUPPORT <br />ROAD DESIGN <br />Brian Arterbery, PE <br /> <br />BRIDGE DESIGN <br />Michael Vereb, PE <br /> <br />UTILITY COORDINATION <br />+ ADA COMPLIANCE <br />Barbie Swihart Stutzman, PE <br />SUPPORT STAFF <br />90 Years of Experience <br />PROVEN LEADERSHIP <br />Our team, led by Nick Smith, Dale Wills, Dave Barich, and Jessica <br />Clark, offers an excess of more than <br /> <br /> <br /> <br />Their extensive careers include numerous projects ranging from <br />small structure replacements to multfmillion-dollar road <br />projects. They will draw on their experience to antfcipate and <br />address issues before they become problems. <br /> <br />We assembled an outstanding team with extensive technical <br />expertfse and experience on numerous trail projects including: <br />» Hidden Lake Park Pedestrian Bridge <br />» Eel River Run Trail <br />» LaSalle Trail <br />» Adams Trail <br />» Nickel Plate Trail <br />» Panhandle Pathway <br />» Plymouth South Gateway <br />» Chessie Trail Phase II <br />CAPACITY <br />Lochmueller has over 30 RPRs on staff. We will provide local, <br />experienced professionals dedicated to meetfng the schedule or, <br />if possible, acceleratfng it. <br /> <br />We have also tapped McCormick Engineering (ME) to add <br />capacity and depth to our team and fulfill the DBE requirements. <br /> <br />SERVICE <br />We have one focus - OUR CLIENTS. With every project, our goal <br />is to deliver your project by: <br />» Proactfvely detectfng & resolving any potentfal conflicts & <br />design issues so the project will stay on schedule <br />» Keeping the public informed about the constructfon <br />schedule & addressing concerns in a tfmely manner <br /> <br />Our INDOT-Certffied technicians have the available equipment and <br />knowledge to make sure all materials and work will comply with <br />the latest INDOT Frequency of Sampling and Testfng Manual. <br />» On-Site Inspectfon <br />» SiteManager Responsibilitfes <br />» Material Records/Testfng <br />» Progress Meetfngs <br />» Utflity Coordinatfon <br />» Pay Applicatfons, Estfmates <br />& Change Orders <br />» As-Builts & Lightfng As-Builts <br />» Erosion Control Monitoring <br />» Public Notfces <br />» Final Constructfon Records <br />PROJECT TEAM <br />DAVE BARICH, PE, PS <br />CONSTRUCTION MANAGER <br />JESSICA CLARK, PE <br />CLIENT SERVICE MANAGER
The URL can be used to link to this page
Your browser does not support the video tag.