My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:30:41 PM
Creation date
8/23/2022 1:30:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE IIB) 7 <br />NICK SMITH | RESIDENT PROJECT REPRESENTATIVE <br />BS, Constructfon Engineering & Management Technology, Purdue University | INDOT Certffied Technician (Exempt) | INDOT SiteManager | 10 – Hour <br />OSHA Certffied <br /> <br />With eight years of experience, Nick will serve as Resident Project Representatfve. He has served as the lead <br />constructfon project manager for INDOT on multfple contracts. Nick’s responsibilitfes include inspectfng projects to <br />monitor progress and adherence to design specificatfons, managing field personnel, soils and concrete testfng, <br />preparing estfmates, verifying quantftfes, and completfng final constructfon records utflizing INDOT SiteManager. <br /> <br /> <br />Nick will lead the inspection process to successfully deliver the project and its paperwork ON TIME. He will be a direct point of <br />contact, responsible for relaying project updates and relaying information, overseeing contract administration, and managing the <br />process. <br /> <br />RELEVANT EXPERIENCE <br />I-94 over US 20 & East Branch of Trail Creek, LaPorte County for INDOT, LaPorte <br />District <br />» Lead Constructfon Project Manager for bridge deck overlay <br />» Contract included milling the old bridge deck/RCBA & hydro demolitfon, placing <br />latex modified overlay on bridge & RCBA, adding cofferdams around encased piles <br />to perform patching & fiber wrapping of the reinforced concrete pile encasement, <br />repairing the slopewall with flowable fill, filling eroded areas of slopewall with <br />geotextfles & revetment riprap, & HMA wedge & level transitfon <br />» Constructfon Cost: $1.67 million <br />PROJECT TEAM <br />US 20 & SR 2 Interchange, LaPorte County for INDOT, LaPorte District <br />» INDOT Constructfon Project Manager for new bridge & dog-bone interchange <br />» Responsible for on-site staffing, review of contractor performance, ensuring <br />contractor was following contract documents & specificatfons, quantfty <br />verificatfon, pay estfmates, progress meetfngs, & project closeout <br />» Contract included over 5,300 LFT of various sized pipe installatfon, 43 <br />structures, pipe cleaning, new pile driving, & approximately 110,000 cubic <br />yards of earthmoving <br />» Constructfon Cost: $9.25 million <br /> <br />US 20 over I-80/90 Indiana Toll Road, LaPorte County for INDOT, LaPorte District <br />» INDOT Constructfon Project Manager for a bridge deck replacement <br />» Contract included the State’s first implementatfon of Transparent Deck Pans <br />» Constructfon Cost: $2.5 million <br /> <br />SR 23 from Main Street to Bittersweet Trail, St. Joseph County for INDOT, <br />LaPorte District <br />» Project Supervisor for Preventfve Maintenance HMA Overlay <br />» Work included rebuilding ADA curb ramps, 1.5” mill & asphalt overlay, new <br />signal loops, pavement markings, RPM's, & upgraded signage <br />» Coordinated with Canadian Natfonal railroad/INDOT for the rebuilt railroad <br />crossing & matched seamlessly into it <br />» Work completfng in September, ahead of schedule & under budget <br /> US 20 & SR 2 Interchange, <br />LaPorte County <br /> US 20 over Indiana Toll Road, <br />LaPorte County <br />Nick is 100% available for Phase IIB Inspectfon <br /> SR 23 & Bittersweet Road, <br />St. Joseph County
The URL can be used to link to this page
Your browser does not support the video tag.