My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Engineering Services for SBCSC – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Engineering Services for SBCSC – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:29:19 PM
Creation date
8/9/2022 2:28:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Proposal 22222 2 of 3 <br /> <br /> <br />4. Fee & Schedule of Rates <br /> <br />4.1 Proposed fee & estimated reimbursables for items listed in schedule of deliverables: <br /> <br />Item Fee <br />Cost Model $6,400 <br />SD Estimate EXCL <br />DD Estimate EXCL <br />Kickoff Meeting/walkthrough per 2.2 a $800 <br />Review Meeting per 2.2b INCL <br />Reconciliation with CM/third party per 2.2c EXCL <br />Total Fee $7,200 <br />Estimated reimbursables not included in above total $150 <br /> <br />4.2 Schedule of rates for ad hoc cost estimating services not included in base fee: <br /> <br />Grade FY 22 <br />Principal $200.00/Hr. <br />Senior/Lead Estimator $136.50/Hr. <br />Estimator $105.00/Hr. <br />Assistant Estimator $52.50/Hr. <br /> <br />4.3 Travel shall be reimbursed at the following rates: <br /> <br />Mileage Prevailing IRS rate <br />Per Diem Prevailing IRS rate <br />Air Fares/Lodging/Other Travel At cost <br /> <br /> <br />5. Exclusions: <br /> <br />Attendance at planning workshops/charettes <br />Attendance at client presentations <br />Attendance at design committee meetings or workshops <br />Full time staff placement at Client/project offices <br />Estimates of Owner administration and project management costs <br />Estimates of non-construction items, for example furniture <br />Estimates of land/property acquisition/relocation/swing space <br />Estimating services/stage estimates other than those identified in schedule of deliverables <br />Ongoing cost control <br />Estimation of asbestos abatement &/or environmental/hazmat remediation. <br />Value engineering & estimating scope reductions, if required <br />Bid analysis and support <br />Cost estimating support during construction <br />DocuSign Envelope ID: AD573822-6EB6-43FA-9F1F-743C8A6D3FB4
The URL can be used to link to this page
Your browser does not support the video tag.