My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:26:58 PM
Creation date
7/26/2022 1:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br /> 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com <br />Time and Work Related to the Halogen Panels Needing 24 Volts <br />Labor/Equipment: $0 <br />Material: $0 <br />Subcontractor: $880.00 <br />Markup: $90.20 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $970.2 0 <br />LCP 104 Panel Modifications to Extend 24 Volt to Internal Terminal Blocks <br />Labor/Equipment: $0 <br />Material: $100.00 <br />Subcontractor: $880.00 <br />Markup: $100.45 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $1,080 .45 <br />Install Wire in Existing Conduit to Create a Signal that Scrubber is Running if <br />in the Manual on Switch is Why it is Running <br />Labor/Equipment: $0 <br />Material: $53.00 <br />Subcontractor: $330.00 <br />Markup: $39.10 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $422.1 0 <br />Conduit, Fittings, Wire, etc to Run 120 Volt Power to the Regulators from the <br />120/208 Volt Panel <br />Labor/Equipment: $0 <br />Material: $1,382.00 <br />Subcontractor: $1,760.00 <br />Markup: $321.95 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $3,463 .95 <br />Relocate the Old Building Trouble Light and Horn to the Scrubber Panel <br />Labor/Equipment: $0 <br />Material: $57.00 <br />Subcontractor: $440.00 <br />Markup: $51.10 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $548.1 0
The URL can be used to link to this page
Your browser does not support the video tag.