My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:26:58 PM
Creation date
7/26/2022 1:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 3 <br /> 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com <br />Install a Push Button Switch from the Old 104 Panel on the New Panel, <br />Wire it to Reset the Actuator Closed Indication on the SCADA Screen <br />Labor/Equipment: $0 <br />Material: $0 <br />Subcontractor: $440.00 <br />Markup: $45.10 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $485.1 0 <br />TOTAL COST OF CHANGE ORDER $37,490.90 <br />We look forward to the opportunity to review this proposal with you. If you have any questions regarding this <br />proposal, feel free to contact me at 317-518-9721. <br />Sincerely, <br />BOWEN ENGINEERING CORPORATION <br />Nick Isenhower <br />Project Engineer
The URL can be used to link to this page
Your browser does not support the video tag.