My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 3 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinfection Improvements Proj No. 119-069A - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:26:58 PM
Creation date
7/26/2022 1:26:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 3 <br /> 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com <br />April 18, 2021 <br />(E-Mail) <br />Benjamin Burroughs <br />Water Resource Engineer <br />Arcadis U.S., Inc. <br />150 West Market Street Suite 278 <br />Indianapolis, IN 46204 <br />RE: South Bend WWTP Upgrades <br />Bowen Project # 15-21-008 <br />RE: RFQ-018 – Electrical CL Modifications <br />Dear Mr. Burroughs: <br />Bowen Engineering Corporation (BEC) is pleased to provide you with the following change request for the <br />electrical CL Modifications. All work was tracked as T&M. <br />24 +/- Additional Digital/Analog Points <br />Labor/Equipment: $0 <br />Material: $11,426.00 <br />Subcontractor: $13,300.00 <br />Markup: $2,534.10 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $27,26 0 .1 0 <br />Conduit/Wire for the 24 Volt Signal from PLC 104 to Start Scrubber <br />Labor/Equipment: $0 <br />Material: $1,032.00 <br />Subcontractor: $1,320.00 <br />Markup: $365.00 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $2,717 .00 <br />Work to Control Interior Louver, WME Said Not In Their Scope, Had to Tie in <br />a Relay in the Scrubber Control Panel <br />Labor/Equipment: $0 <br />Material: $53.00 <br />Subcontractor: $440.00 <br />Markup: $50.90 <br />Bonds/Insurance: $0 <br />Total Additional Cost: $543.90
The URL can be used to link to this page
Your browser does not support the video tag.