Laserfiche WebLink
SOUTH BEND 2022 CCMG ROAD REHABILITATION - RAINBOW DRIVE Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 122-024 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 6/28/2022 <br />$733,000.00 $0.00 $0.00 <br />$347,610.00 $0.00 $0.00 <br />$0.00 $385,390.00 $385,390.00 <br />90.2%0.0%0.0% <br />0.0%100.0%100.0% <br />Bid Form, All Pages <br />Form 96 <br />Financial Statement <br />Bid Bond <br />DIVISION 1A - RAINBOW DRIVE BASE BID (FROM SOUTHLEA DR. TO CUL-DE-SAC) <br />Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension <br />1 Common Excavation 611 CYS $25.00 $15,275.00 $145.00 $88,595.00 $0.00 $0.00 <br />2 Concrete, Remove 2353 SYS $14.00 $32,942.00 $14.00 $32,942.00 $0.00 $0.00 <br />3 Subgrade Treatment Type II 3180 SYS $14.00 $44,520.00 $20.00 $63,600.00 $0.00 $0.00 <br />4 Compacted No. 53 Subbase 928 TON $29.00 $26,912.00 $30.00 $27,840.00 $0.00 $0.00 <br />5 Sidewalk, Concrete 73 SYS $108.00 $7,884.00 $250.00 $18,250.00 $0.00 $0.00 <br />6 Curb Ramp, Concrete 69 SYS $280.00 $19,320.00 $385.00 $26,565.00 $0.00 $0.00 <br />6A Milling, 2 In.22 SYS $20.00 $440.00 $250.00 $5,500.00 $0.00 $0.00 <br />6B Milling, 4 In.22 SYS $30.00 $660.00 $250.00 $5,500.00 $0.00 $0.00 <br />7 HMA Surface, 9.5 mm - Type B 195 TON $115.00 $22,425.00 $160.00 $31,200.00 $0.00 $0.00 <br />8 HMA Intermediate, 12.5 mm - Type B 324 TON $105.00 $34,020.00 $180.00 $58,320.00 $0.00 $0.00 <br />9 HMA Base, 25.0 mm - Type B 518 TON $100.00 $51,800.00 $105.00 $54,390.00 $0.00 $0.00 <br />9A Tack Coat 2 TON $500.00 $1,000.00 $1.00 $2.00 $0.00 $0.00 <br />9B Joint Adhesive, Surface 663 LFT $2.00 $1,326.00 $1.00 $663.00 $0.00 $0.00 <br />10 PCCP for Approaches, 6 in.197 SYS $82.00 $16,154.00 $245.00 $48,265.00 $0.00 $0.00 <br />11 Combined Curb & Gutter, Type A 1412 LFT $30.00 $42,360.00 $89.00 $125,668.00 $0.00 $0.00 <br />12 Sodding, Nursery 506 SYS $9.00 $4,554.00 $36.00 $18,216.00 $0.00 $0.00 <br />13 Adjust Manhole Casting to Grade 3 EA $888.00 $2,664.00 $2,200.00 $6,600.00 $0.00 $0.00 <br />14 Adjust Water Valve Box to Grade 1 EA $686.00 $686.00 $300.00 $300.00 $0.00 $0.00 <br />15 Furnish and Adjust Casting to Grade 2 EA $1,964.00 $3,928.00 $2,900.00 $5,800.00 $0.00 $0.00 <br />16 Mailbox Assembly, Remove & Reset 12 EA $210.00 $2,520.00 $500.00 $6,000.00 $0.00 $0.00 <br />17 Fence, Remove & Reset 20 LFT $150.00 $3,000.00 $340.00 $6,800.00 $0.00 $0.00 <br />18 Construction Engineering 1 LS $6,800.00 $6,800.00 $4,200.00 $4,200.00 $0.00 $0.00 <br />19 Mobilization and Demobilization 1 LS $17,000.00 $17,000.00 $36,600.00 $36,600.00 $0.00 $0.00 <br />20 Clearing Right of Way 1 LS $6,800.00 $6,800.00 $35,000.00 $35,000.00 $0.00 $0.00 <br />21 Maintenance of Traffic 1 LS $17,000.00 $17,000.00 $25,434.00 $25,434.00 $0.00 $0.00 <br />22 Erosion Control 1 LS $3,400.00 $3,400.00 $750.00 $750.00 $0.00 $0.00 <br />TOTAL BASE BID $385,390.00 $733,000.00 $0.00 $0.00 <br />Date:7/6/2022 <br />Nitin Timble, P.E. <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this <br />project. <br />% over <br />% Under <br />Milestone Contractors North, Inc. <br />Amount Over <br />Amount Under <br />Engineer's Estimate <br />$385,390.00Base Bids Total <br />Yes <br />Yes <br />Yes <br />Yes <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A