Laserfiche WebLink
SOUTH BEND 2022 CCMG ROAD REHABILITATION - RAINBOW DRIVE Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 122-024 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 6/28/2022 <br />NO BID $0.00 $0.00 <br />$0.00 $0.00 $0.00 <br />$0.00 $417,798.00 $417,798.00 <br />0.0%0.0%0.0% <br />0.0%100.0%100.0% <br />Bid Form, All Pages <br />Form 96 <br />Financial Statement <br />Bid Bond <br />DIVISION 1B - RAINBOW DRIVE ALTERNATIVE BID (FROM SOUTHLEA DR. TO CUL-DE-SAC) <br />Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension <br />1 Common Excavation 546 CYS $25.00 $13,650.00 No Bid $0.00 $0.00 <br />2 Concrete, Remove 2353 SYS $14.00 $32,942.00 No Bid $0.00 $0.00 <br />3 Subgrade Treatment Type II 3180 SYS $14.00 $44,520.00 No Bid $0.00 $0.00 <br />4 Compacted No. 53 Subbase 928 TON $29.00 $26,912.00 No Bid $0.00 $0.00 <br />5 Sidewalk, Concrete 73 SYS $108.00 $7,884.00 No Bid $0.00 $0.00 <br />6 Curb Ramp, Concrete 69 SYS $280.00 $19,320.00 No Bid $0.00 $0.00 <br />6A Milling, 2 In.22 SYS $20.00 $440.00 No Bid $0.00 $0.00 <br />6B Milling, 4 In.22 SYS $30.00 $660.00 No Bid $0.00 $0.00 <br />7 PCCP for Mainline, 7 in.2354 SYS $46.00 $108,284.00 No Bid $0.00 $0.00 <br />8 D-1 Joints 1721 LFT $20.00 $34,420.00 No Bid $0.00 $0.00 <br />9 PCCP for Approaches, 6 in.197 SYS $82.00 $16,154.00 No Bid $0.00 $0.00 <br />10 Combined Curb & Gutter, Type A 1412 LFT $30.00 $42,360.00 No Bid $0.00 $0.00 <br />11 Sodding, Nursery 506 SYS $9.00 $4,554.00 No Bid $0.00 $0.00 <br />12 Adjust Manhole Casting to Grade 3 EA $88.00 $264.00 No Bid $0.00 $0.00 <br />13 Adjust Water Valve Box to Grade 1 EA $686.00 $686.00 No Bid $0.00 $0.00 <br />14 Furnish and Adjust Casting to Grade 2 EA $1,964.00 $3,928.00 No Bid $0.00 $0.00 <br />15 Mailbox Assembly, Remove & Reset 12 EA $210.00 $2,520.00 No Bid $0.00 $0.00 <br />16 Fence, Remove & Reset 20 LFT $150.00 $3,000.00 No Bid $0.00 $0.00 <br />17 Construction Engineering 1 LS $7,400.00 $7,400.00 No Bid $0.00 $0.00 <br />18 Mobilization and Demobilization 1 LS $18,400.00 $18,400.00 No Bid $0.00 $0.00 <br />19 Clearing Right of Way 1 LS $7,400.00 $7,400.00 No Bid $0.00 $0.00 <br />20 Maintenance of Traffic 1 LS $18,400.00 $18,400.00 No Bid $0.00 $0.00 <br />21 Erosion Control 1 LS $3,700.00 $3,700.00 No Bid $0.00 $0.00 <br />TOTAL ALTERNATIVE BID $417,798.00 NO BID $0.00 $0.00 <br />Date:7/6/2022 <br />Nitin Timble, P.E. <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this <br />project. <br />% over <br />% Under <br />Milestone Contractors North, Inc. <br />Amount Over <br />Amount Under <br />Engineer's Estimate <br />$417,798.00Alternative Bids Total <br />Yes <br />Yes <br />Yes <br />Yes <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A