Laserfiche WebLink
MDA Proposal: «ProjectNumber» <br />PROPOSAL <br />M22-0160 – MLK, JR. COMMUNITY CENTER_PHASE 2 Services MDA PROPOSAL <br />PROJECT PHASES: <br />PHASE 1: PRE-DESIGN / PROGRAMMING / COMMUNITY ENGAGEMENT: (COMPLETE) <br />PHASE 2: ARCHITECTURAL SERVICES TO PREPARE CONSTRUCTION DOCUMENTS <br />(THERE ARE TWO (2) BID PACKAGES: DEMOLITION and NEW BUILDING) <br />Following completion of Phase 1: Pre-Design services, after receipt of Notice-To-Proceed from the owner, The <br />Architect will engage with you to complete the design and construction documentation for the new MLK, Jr. <br />Community Dream Center. After confirmation of project program, scope, scale, and budget in Phase 1: Pre -Design, <br />we will determine at that time if increase adjustments to the project fees need to be made to the contract. We will <br />discuss all required contractual obligations prior to commencement of Phase 2 services. <br />Based on the Phase 1: Pre-Design prepared by the Architect, it is necessary for the Architect to refine and further <br />develop the design during the following phases of the work. For completion of the agreed upon services, the Architect <br />shall manage their services, consult with the Owner, research applicable design criteria, attend meetings and <br />communicate with the team prepared to complete the project design and report progress to the Owner. For proper <br />completion of the scope of work, the Architect shall rely on the accuracy and completeness of the items furnished by <br />the Owner and/or Owner's consultants. The deliverables for the phases necessary to complete construction <br />documents will include the following: <br />DESIGN DEVELOPMENT PHASE <br />Note: Services outlined below shall be for both the Demolition and New Building Packages. <br />We will prepare design development documents for the new facility. A separate package shall be prepared and <br />developed for the demolition of the existing facility. The design development drawings will be presented at a larger <br />scale (24" x 36" or 30” x 42”) illustrating further development and detail of the approved schematic design. Drawings <br />and specifications source files (PDF, DWG, Revit, and MS Word) to be provided to the client for record. 11”x17” size <br />prints of drawings can be provided to the client if required. Design Development phase will include the following: <br />1.Based on the Schematic Design Documents approved by the Owner and any adjustments authorized by the <br />Owner in the program, schedule or construction budget, the Architect will prepare for approval by the Owner, <br />Design Development Documents consisting of drawings and other documents to fix and describe the size and <br />character of the Project as to architectural, structural, mechanical, and electrical systems, materials and such <br />other elements as may be appropriate. <br />2.The Design Development Drawings are to include: Plan details, Section details, Preliminary Finish Schedule, <br />Preliminary Door and Window Schedules, and Outline Specification (where applicable). <br />3.Architecturally, we will conduct a preliminary code review on the building in accordance with the current edition <br />of the International Building Code and governing jurisdictional codes relative to the Design Development Phase <br />of the project. <br />4.The Architect shall prepare Design Development Pricing Documents from which an estimate of the cost of <br />construction shall be prepared. In the absence of an owner contractor, the Architect may prepare an Architects <br />Design Estimate based on industry data for construction costs by square footage. This estimate may vary as the <br />project progresses due to changes in the Scope or Quality of Construction and/or changes in the Time of <br />Construction. The Architect shall endeavor to advise the Owner of such variations but shall not be required to <br />quantify the changes on behalf of the Owner’s contractor(s). Unless certified by the Owner’s Contractor(s) any <br />estimate prepared by the Architect is considered neither a fixed limit of construction cost nor a guarantee of such <br />costs. <br />5.The Architect shall present the Owner with their evaluation of the project and discuss alternative approaches to <br />design and construction including the feasibility of incorporating environmentally responsible design into the