My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. 420 South Eddy Street_COA 2022-0606
sbend
>
Public
>
Historic Preservation
>
2022
>
June
>
3. 420 South Eddy Street_COA 2022-0606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 2:16:35 PM
Creation date
6/14/2022 2:15:52 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
420 South Eddy Street
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />08-51-00 - 12 ALUMINUM WINDOWS – SERVICE BUILDING 08-51-00 - 12 <br /> E. Approved Manufacturers and Products: The sun shade device manufacturer shall be the <br /> same manufacturer as the window products being installed. <br /> <br />1. EFCO: E-Shade (Basis of the Project Design and Specification) <br /> <br />2. Graham Architectural Products: (Compatible and integral with window system) <br /> <br />3. Kawneer Company: Versoleil SunShade – Outrigger System <br /> <br />4. WAUSAU Window and Wall Systems: Clear Story <br /> <br />5. Winco Windows: (Compatible and integral with window system) <br /> <br />6. YKK-AP: Therma Shade <br /> <br />7. Architect approved equal required prior to bid <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 SURFACE CONDITIONS: <br /> <br />A. Inspections: <br /> <br />1. Prior to all work of this Section, carefully inspect the installed work of all other trades <br />and verify that all such work is complete to the point where this installation may <br />properly commence. <br /> <br />2. Verify that all windows may be installed in accordance with all pertinent codes and <br />regulations, the original design, and the referenced standards. <br /> <br />B. Discrepancies: Do not proceed with installations in areas of discrepancy until all such <br />discrepancies have been fully resolved. Immediately notify the Architect in writing of all <br />discrepancies discovered. <br /> <br />3.02 INSTALLATION: <br /> <br />A. Set window units plumb, level, and true to line, without warp or rack of frames or sash. <br />Provide proper support and anchor securely in place. <br /> <br /> 1. Separate aluminum and other corrodible surfaces from sources of corrosion or <br />electrolytic action at points of contact with dissimilar materials in compliance with <br />AAMA 101, “Dissimilar Materials” section. <br /> <br />2. Provide all required clips, anchors, and fastenings as required by job conditions to <br />secure to adjacent construction and/or steel structure. <br /> <br />3. Install all exterior extensions, panning and trim with clean crisp hairline joints. Head <br />to jamb joints shall be miter appearance with the jamb extending behind the head <br />piece. Miter cut and cope/back cut the head section for a tight joint. Jamb to sill <br />joints shall be vertical. Back seal all exterior panning and trim joints before installing <br />the window unit where practical. Interior trim joints shall be closed miter cuts at the <br />head-to-jamb, and tight horizontal joints at jamb-to-sill. <br /> <br />B. Set sill members and other window components in a bed of sealant, or on a gasket to provide <br />a weathertight construction. Coordinate the window installation with wall flashing and other <br />components of the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.