Laserfiche WebLink
20 <br />b.The assumed Section 106 finding is “No Adverse Effect.” A Section 106 finding <br />of “Adverse Effect” will constitute additional services. <br />9.Post NEPA approval documentation: Prepare final project commitment report and submit <br />Environmental Consultation Form. <br />10.Other items not included in the proposed scope of services: <br />a.Karst investigations <br />b.Noise Analysis <br />c.Air Quality Analysis <br />d.Section 404/401 permitting <br />e.Floodway permitting <br />f.Wetland or stream mitigation <br />g.Endangered species studies or reports <br />h.Environmental justice analysis <br />i.Public involvement <br />j.Detailed hazardous materials investigations <br />Environmental Compliance Services: Applicable environmental compliance services shall be performed <br />in accordance with the Procedural Manual for Preparing Environmental Documents dated 2008, the <br />Procedural Manual for Preparing Environmental Studies dated July 1996 and revisions thereto on file <br />with INDOT, the Indiana Cultural Resources Manual dated 2008 and other guidance and/or procedures <br />for compliance so issued by INDOT and FHWA including the Indiana Procedures for Categorical <br />Exclusions and Environmental Assessments dated 2013 and FHWA Indiana Section 106 Consultation <br />Procedures dated March 2002. <br />D.The CONSULTANT shall develop the plans for the project to include the following: <br />1.Design of new and replacement concrete sidewalk, curbs, and curb ramps. <br />2.Signing and Pavement Marking Plans will be in accordance with the Indiana Manual of <br />Uniform Traffic Control Devices, current edition. <br />3.Pedestrian maintenance of traffic plans. <br />E.The CONSULTANT shall perform the design of this Project on the basis that the project shall be <br />funded with Federal funds. Design changes due to alternate funding of the project shall be <br />considered Additional Services. <br />F.The project will be designed in English units and in accordance with the following references, <br />policies and guidelines: <br />1.American Association of State Highway and Transportation Officials -“Guide for the <br />Development of Bicycle Facilities”, 2012, <br />2.American Association of State Highway and Transportation Officials-“A Policy on <br />Geometric Design of Highways and Streets”, 2011, <br />3.American Association of State Highway and Transportation Officials-“Roadside Design <br />Guide”, 2011, <br />4.Indiana Department of Transportation Standard Specifications 2014, <br />5.INDOT Road and Bridge Memoranda, <br />6.INDOT Drainage Design Manual, <br />7.INDOT Roadway Design Manual, <br />8.INDOT Right Of Way Engineering Manual, <br />9.Indiana Manual on Uniform Traffic Control Devices for Streets and Highways <br />(MUTCD), <br />10.Where conflict exists between the standards, those of the Indiana Department of <br />Transportation shall prevail, unless otherwise directed. <br />G.The CONSULTANT shall prepare the design and plans in accordance with the INDOT Design <br />Manual, Chapter 14. All submittals to INDOT will be via electronic submission through <br />INDOT’s ERMS site. The CONSULTANT will provide the OWNER with hard copies of all <br />items submitted to INDOT, upon OWNER’s request. <br />H.In accordance with the INDOT LPA Process Guidance Document for Local Federal Aid Projects, <br />the CONSULTANT shall prepare Stage 1, Stage 3 and Final Tracings Submissions to INDOT in