My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Randolph Park Area Improvements Proj No. 120-049 - Rieth-Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - Randolph Park Area Improvements Proj No. 120-049 - Rieth-Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 2:26:59 PM
Creation date
3/8/2022 2:25:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Prevailing Specifications: None <br />B. Additions: <br />1. The Contractor shall be responsible for trash, yard waste, and recycling collection within <br />the project limits. The Contractor shall coordinate with the City of South Bend Solid Waste, <br />Waste Management, and other pickup services as requested to ensure collection services <br />are maintained. The Contractor shall be required to collect bins, place them in a common <br />point for easy access by automated truck services, and redistribution after pickup as <br />requested. <br />2. The Contractor shall be responsible for snow removal within the project limits and shall <br />coordinate with City of South Bend Public Works. The Contractor is responsible for <br />protecting his/her/its project site from excessive wear and tear during snow removal. <br />XXV. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 8 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall <br />govern. <br />XXVI. STORM STRUCTURE, REMOVE <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 206 <br />1. Measurement and Payment <br />a. Payment for removal of existing Storm Structures, including the cost of all materials, <br />equipment, tools, labor, transportation, operations, and all other incidentals, shall.be <br />paid for on a per item basis under the pay item: <br />STORM STRUCTURE, REMOVE...............................................................EA <br />XXVI1. PAVEMENT, REMOVE <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 202, 203 <br />B. Additions: <br />1. The Contractor shall remove and dispose of any concrete pavement areas shown on the <br />plans to be removed or as directed by the Engineer. <br />Version 08/25/2021 Special Provisions -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.