Laserfiche WebLink
supplies or temporary facilities shall be left unattended in the right-of-way of any street or <br />left parked overnight without proper marking and lighting. <br />4. After the award of the contract and before beginning the work, the Contractor shall submit <br />his/her/its proposed schedule of operations for the review of the Engineer. The schedule <br />of operations as reviewed by the Engineer shall be maintained at all times. <br />5. There will be no direct payment for this work. <br />XXII. PRE -CONSTRUCTION VIDEO OF SITE CONDITIONS <br />A. Prevailing Specifications: None. <br />B. Additions: <br />The Contractor shall be required to submit a professionally completed DVD recording of <br />the project area to clearly show driveways, street pavements, signs, traffic signals, etc., <br />prior to the start of construction to verify before and after conditions. The DVD shall indicate <br />the date of the recording and also include a method to identify the street or area being <br />videotaped such as stationing or some other unique identifier. <br />2. One original and two copies shall be forwarded to the Engineer for review prior to beginning <br />construction and shall become the property of the Owner. <br />3. All DVD's shall be professionally labeled showing the Owner's name, name of project and <br />the name of the Contractor. <br />4. Measurement and Payment <br />a. Payment for all costs of providing DVD record shall be paid for on a lump sum basis <br />for all parts under the pay item: <br />XXIII. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. Work includes the removal of existing asphalt pavement for the north half block of the <br />Sampson Street between Calvert and Randolph Streets in South Bend and installation of <br />a new asphalt hammerhead turnaround, including new asphalt and concrete curb at the <br />alleyway immediately south of Randolph Park, and installation of new storm sewer and <br />turf restoration in the park, all more particularly described in plans and specifications <br />prepared by Jones Petrie Rafinski, phone 574-232-4388. <br />2. The Base Bid covers all work associated with removal of the portion of Sampson St and <br />the installation of the hammerhead turnaround according to the intent of the Plans and <br />Specifications. <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, <br />visitors and their property from damage caused by the Contractor's operations. <br />XXIV. MUNICIPAL OPERATIONS <br />Version 08/25/2021 Special Provisions - 9 <br />