Laserfiche WebLink
2. All pavement areas to be removed shall be neat line saw cut at removal limits for full depth <br />removal. <br />3. Pavement removal shall include concrete sidewalk and asphalt roadways. <br />4. Measurement and Payment <br />a. Concrete type pavement removal shall be paid for on a square yard basis under the <br />pay item: <br />CONCRETE PAVEMENT, REMOVE.............................................................SYS <br />b. Asphalt type pavement removal shall be paid for within the pay item for Common <br />Excavation for all parts: <br />COMMON EXCAVATION............................................................................CYS <br />c. Saw cutting for removal shall not be measured for pavement but shall be considered <br />incidental to the Contract for all parts. <br />XXVIII. EARTHWORK <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 203 <br />B. Additions: <br />1. Earthwork includes all excavation of soils, and any other materials within the project limits <br />not paid for elsewhere, to establish the grades required by the work, including undercut <br />required to establish pavement base grades. <br />2. Earthwork includes the transportation, hauling and disposal of excess material from the <br />project limits, with the exception of pavement removal, which is to be considered incidental <br />to the PAVEMENT, REMOVE and COMMON EXCAVATION Pay Items. <br />3. Contractor may not spoil excavated material within the lawn anywhere within the park or <br />surrounding neighborhood without prior written authorization of the Owner for the specific <br />area in question. <br />4. Measurement and Payment <br />a. Payment for all costs associated with earthwork as defined above, will not be paid <br />directly, but shall be included in the cost of various items of the contract for all parts. <br />XXIX. BACKFILL, BORROW <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 211 <br />B. Additions: <br />1. If onsite excavated material meets the specifications for Backfill, Borrow, then it may be <br />used as directed by the Engineer. The Contractor shall not receive payment for Backfill if <br />onsite material is used. <br />2. Measurement and Payment <br />Version 08/25/2021 Special Provisions -11 <br />