My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Randolph Park Area Improvements Proj No. 120-049 - Rieth-Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - Randolph Park Area Improvements Proj No. 120-049 - Rieth-Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 2:26:59 PM
Creation date
3/8/2022 2:25:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. All pavement areas to be removed shall be neat line saw cut at removal limits for full depth <br />removal. <br />3. Pavement removal shall include concrete sidewalk and asphalt roadways. <br />4. Measurement and Payment <br />a. Concrete type pavement removal shall be paid for on a square yard basis under the <br />pay item: <br />CONCRETE PAVEMENT, REMOVE.............................................................SYS <br />b. Asphalt type pavement removal shall be paid for within the pay item for Common <br />Excavation for all parts: <br />COMMON EXCAVATION............................................................................CYS <br />c. Saw cutting for removal shall not be measured for pavement but shall be considered <br />incidental to the Contract for all parts. <br />XXVIII. EARTHWORK <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 203 <br />B. Additions: <br />1. Earthwork includes all excavation of soils, and any other materials within the project limits <br />not paid for elsewhere, to establish the grades required by the work, including undercut <br />required to establish pavement base grades. <br />2. Earthwork includes the transportation, hauling and disposal of excess material from the <br />project limits, with the exception of pavement removal, which is to be considered incidental <br />to the PAVEMENT, REMOVE and COMMON EXCAVATION Pay Items. <br />3. Contractor may not spoil excavated material within the lawn anywhere within the park or <br />surrounding neighborhood without prior written authorization of the Owner for the specific <br />area in question. <br />4. Measurement and Payment <br />a. Payment for all costs associated with earthwork as defined above, will not be paid <br />directly, but shall be included in the cost of various items of the contract for all parts. <br />XXIX. BACKFILL, BORROW <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 211 <br />B. Additions: <br />1. If onsite excavated material meets the specifications for Backfill, Borrow, then it may be <br />used as directed by the Engineer. The Contractor shall not receive payment for Backfill if <br />onsite material is used. <br />2. Measurement and Payment <br />Version 08/25/2021 Special Provisions -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.