Laserfiche WebLink
City of South Bend: PE/RW Services for Bendix Drive 4 <br />RYAN CLARK, PE <br />Lead Designer <br />BS, Civil Engineering, Purdue University ǀ Professional Engineer: IN <br /> <br />Ryan’s 25 years of transportatfon design, traffic, and safety experience provide <br />him valuable technical knowledge. He held the positfon of Chief Design <br />Engineer for three years of his 10 with the St. Joseph County Department of <br />Public Works. <br /> <br />RELEVANT ROAD EXPERIENCE <br />Cleveland Road & Beech Road Roundabout for St. Joseph County <br />— Project Engineer for a modern hybrid roundabout to replace an existfng 4 -way stop-controlled <br />intersectfon, providing dual-lane approaches for Cleveland Road & single-lane approaches for <br />Beech Road and full reconstructfon of 2,400 feet on Cleveland Road and 850 feet on Beech Road. <br />Est. Construction Cost: $1.9 million (Federal-Aid LPA) <br /> <br />Cleveland Road Reconstruction, Riverside Drive to SR 933, for St. Joseph County <br />— Design Engineer for 4-lane sectfon of roadway reconstructfon consistfng of 5,500 feet of roadway, replacement of concrete pavement and <br />curb, additfon of multf-use path, and pedestrian crossing with lightfng. Cost $8,287,000 (Federal-Aid LPA) <br />CR 4 – CR 17 to CR 19 for Elkhart County Highway Department <br />— Project Manager/Lead Designer for intersectfon improvements and HMA widening to provide a dual left -turn movement for the WB-SB <br />movement, mill/resurface of CR 17, and design of a new roadway corridor to extend CR 4 from CR 17 to CR 19 with realignment o f toll road <br />access and constructfon of a new 3 -leg roundabout with bypass lanes and dual lane westbound approach for future development alon g the <br />corridor. Design also includes a second 3-leg roundabout to serve a new Amazon site and future development, sanitary sewer and watermain <br />extensions, roundabout lightfng, and HMA widening. Estimated Construction Cost: $15,000,000 <br /> <br />Pioneer Drive Reconstruction from US 30 to 7B Road for the City of Plymouth <br />— Project Manager & Design Engineer for reconstructfon of approximately 2,000 feet of roadway widening drainage improvement. Design <br />elements include new pavement design with subgrade treatment to address poor soils, storm sewer and open ditch drainage desig n, <br />pavement markings, and review of quantfty calculatfons. The project also included the preparatfon of a Community Crossings Ma tch Grant <br />applicatfon. Estimated Construction Cost: $925,000 <br />CJ CUNNINGHAM <br />Environmental Lead <br />BUPD, Urban Planning & Development, Ball State <br />University <br /> <br />Over the course of 15 years, C.J. has <br />established himself as an authority in the <br />arenas of urban planning and environmental <br />services. He has authored or managed more than 100 approved <br />NEPA documents, making him an expert in environmental policy <br />and the NEPA delivery process. <br /> <br />RELEVANT PROJECT EXPERIENCE <br />US 231 at Cline Avenue Intersection Improvement <br />— Environmental Engineer working with INDOT LaPorte District on <br />the early stages of this high-profile project, located only one mile <br />south of the proposed corridor, managing preparatfon of initfal <br />environmental analyses, and coordinatfng design changes to <br />ensure no adverse impacts would affect an adjacent historic farm. <br /> <br />Vale Park West Pathway for City of Valparaiso <br />— Author of a Level-2 CE that documented the project’s impacts, <br />including crossing a regulated floodway and alternatfve alignments <br />throughout the environmental process. <br />TEAM RESUMES <br />JUSTIN BOWERS, PE <br />Road Design <br />BS, Civil Engineering, Purdue University ǀ Professional <br />Engineer: IN <br /> <br />For more than four years, Justfn has provided <br />services to Lochmueller as a project engineer <br />while providing analysis, planning, and design <br />needs for a variety of transportatfon projects. He has a wealth of <br />experience designing urban and rural highways and roads, trails and <br />pedestrian walks, maintenance of traffic plans, constructfon cost <br />estfmatfons, and plan preparatfon. He brings a robust resume with <br />numerous credits to INDOT LDO, northwest Indiana, and city, county, <br />federal, public, and private entftfes. <br /> <br />RELEVANT PROJECT EXPERIENCE <br />Bridge 303 (Bendix Drive SBL over the Indiana Toll Road) for St. <br />Joseph County <br />— Project Engineer for the bridge rehabilitatfon replacement of deck <br />and approach slabs and semi-integral conversion of a 5-span, <br />contfnuous steel beam bridge with vaulted abutments. <br /> <br />CR 17 – Segment 1 for Elkhart County Highway Department <br />– Project Engineer for a new 2.62-mile road constructfon along <br />existfng road including added culverts and drainage ditches. <br />CLEVELAND ROAD <br />RECONSTRUCTION