My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Reject Bids/Quotes/Proposals
>
Rejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:40:25 AM
Creation date
2/10/2022 9:39:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 08/25/2021 Page - 10 Public Works Quote <br />COMMON EXCAVATION ……………………..…………………..……………..………….CYS <br />XI. PAVEMENT, REMOVE <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 202, 203 <br /> <br />B. Additions: <br /> <br />1. The Contractor shall remove and dispose of any concrete pavement areas shown on the plans to <br />be removed or as directed by the Engineer. <br /> <br />2. All pavement areas to be removed shall be neat line saw cut at removal lim its for full depth removal. <br /> <br />3. Measurement and Payment <br /> <br />a. Concrete type pavement removal shall be paid for on a square yard basis under the pay item: <br /> <br />PAVEMENT, REMOVE…………………..……………………………………………....SYS <br /> <br />b. Asphalt type pavement removal, other than that called out for milling, shall be paid for within <br />the pay item for Common Excavation for all parts: <br /> <br />COMMON EXCAVATION…………………..…………………………………………….CYS <br /> <br />c. Saw cutting for removal shall not be measured for pavement but shall be considered incidental <br />to the Contract for all parts. <br /> <br />XII. CONCRETE SIDEWALK REMOVAL <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 202 <br />B. Additions: <br />1. Measurement and Payment <br /> <br />a. Payment for all costs of Sidewalk, Concrete, Remove, including the cost of all materials, <br />equipment, tools, labor, transportation, operations, incidental neat line sawcut, and all other <br />incidentals, shall be paid for on a square yards basis for all parts under the pay item: <br /> <br />SIDEWALK, CONCRETE, REMOVE…………..…………………………………………SYS <br />XIII. CURB REMOVAL <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 202 <br /> <br />B. Additions: <br />1. Disposal of debris resulting from the removal operations shall be at an off -site area, provided by <br />the Contractor and approved by the Engineer. No debris shall be left overnight. <br />2. All asphalt, concrete, and curb shall be neat line saw cut at established removal limits prior to <br />removal. All vaults underneath sidewalks shall be located and marked on walkways prior to <br />sawcutting operations. There will be no direct payment for saw cutting but it shall be included in the <br />various removal items. <br />3. Pavement or curb outside of the limits of removal as shown in the plans that are damaged by the <br />Contractor shall be removed and replaced to existing or better conditions at the Contractor’s <br />expense.
The URL can be used to link to this page
Your browser does not support the video tag.