Laserfiche WebLink
<br />Version 08/25/2021 Page - 8 Public Works Quote <br />VIII. CONTACT DESIGNEES <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. The names and contact information for each representative designated by the Contractor for <br />specific areas of authority shall be provided no later than the project Preconstruction meeting. At <br />a minimum, such representatives would include, but not be limited to those responsible for overall <br />project supervision, erosion control, traffic control operations, and project safety and compliance. <br />IX. PERMITS <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. The Contractor shall be solely responsible for filing all paperwork required for City of South Bend <br />permits, including but not limited to the City building permit. <br /> <br />2. The Contractor shall be required to observe and obey all requirements of the permits. <br /> <br />3. A City of South Bend standard Street Closure Form shall be submitted by the Contractor prior to <br />each change in access or traffic flow. The Contractor shall submi t the enclosed form to the Public <br />Works Customer Service Staff for approval of the change. Traffic Closure Request Form is <br />included. <br />X. MOBILIZATION AND DEMOBILIZATION <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 110 <br />B. Additions: <br />1. The mobilization portion of this pay item will be limited to 75 percent of the Lump Sum price. The <br />balance of the Lump Sum price will be considered demobilization and will be paid for when all work <br />including final cleanup is completed. <br /> <br />2. Measurement and Payment <br /> <br />a. Payment for all costs of Mobilization and Demobilization, including the cost of all materials, <br />equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for <br />on a lump sum basis for all parts under the pay item: <br /> <br />MOBILIZATION AND DEMOBILIZATION………………………………………………….LS <br />XXIII. COMMON EXCAVATION <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 203 <br />B. Additions: <br />1. Excavation and embankment shall be in accordance with the following: <br /> <br />2. The minimum soil compaction requirements for backfill material and pavement subgrade will be as <br />follows: <br /> <br />Subgrade under any roads, pavements, curbs, and drainage <br />structures <br />100%