Laserfiche WebLink
REGULAR MEETING JANUARY 11, 2022 2 <br /> <br /> <br />Division 1 Total $12,356.00 <br />Division 2 Total No Bid <br />Division 3 Total No Bid <br />Divisions 1-3 Combined Total $12,356.00 <br /> <br /> FERGUSON WATERWORKS <br />1077 Oliver Plow Ct. <br />South Bend, IN 46601 <br />Devin.Nuner@Ferguson.com <br /> Bid was signed by Mr. Devin Nuner <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> No Bid Bond was submitted. <br /> <br />BID: <br />Division 1 Total $10,306.62 <br />Division 2 Total $6,660.87 <br />Division 3 Total $11,853.30 <br />Divisions 1-3 Combined Total $28,820.79 <br /> <br />Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and carried by roll call, the above <br />bids were referred to Engineering for review and recommendation. <br /> <br />OPENING OF QUOTATIONS – WATER WORKS UTILITY SERVICE LINE REPAIR <br />PROGRAM – PROJECT NO. 122-022 (620-439015) <br />Ms. Maradik advised that this was the date set for the receiving and opening of sealed quotations <br />for the above referenced project. The following quotations were opened and read: <br /> <br /> NIEZGODSKI PLUMBING, INC. <br />232 N. Mayflower Rd. <br />South Bend, IN 46619 <br />niezplum@comcast.net <br /> Application was submitted by Mr. David Niezgodski <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> Compliance Bond was received. <br /> <br /> APPLICATION RECEIVED <br /> <br /> BOB FRAME PLUMBING SERVICES, INC. <br />2442 Jaclyn Court <br />South Bend, IN 46614 <br /> Carol@frameplumbing.com <br /> Application was submitted by Mr. Tyler M. Frame <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Contractors Bond was received. <br /> <br /> APPLICATION RECEIVED <br /> <br />Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and carried by roll call, the above <br />quotations were referred to Water Works and Engineering for review and recommendation. <br /> <br />AWARD BID AND APPROVE CONTRACT – WARD BAKERY EXTERIOR <br />RENOVATIONS – PROJECT NO. 121-061R (PR-00013370) <br />Mr. Kyle Silveus, Engineering, advised the Board that on December 14, 2021, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />C & S Masonry Restoration, LLC, 3725 Foundation Ct., South Bend, IN 46628, for Bid Package <br />1 – Masonry in the amount of $160,000 and J.W. Werntz & Son, Inc., 1002 Kerr St., South <br />Bend, IN 46601, for Bid Package 2 – Doors and Windows in the amount of $121,000. <br />Therefore, Mr. Molnar made a motion that the recommendation be accepted, and the bid be <br />awarded, and the contract approved as outlined above. Mr. Gathers seconded the motion, which <br />carried by roll call. <br />