My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December Public Works IPC Report
sbend
>
Public
>
Inclusive Procurement and Contracting Board (MBE/WBE)
>
Reports
>
December Public Works IPC Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2022 10:16:57 AM
Creation date
12/3/2021 3:44:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. WBE Participation: Modern Edge (Mulched Seeding, Silt Fence); State <br />Barricading (Traffic Control); BUC Construction Supply (Water Main <br />Pipe, Fittings, and Materials) <br /> <br />7) Seitz Park Ph. 2 (Bid) - Bid Open 12/14 <br />i. Base Bid: 3.7% W and 2.2% M <br />ii. Alternate 1: 5.4% W and 3.5% M <br />iii. Alternate 2: 3.5% W and 2.0% M <br /> <br />8) North Water Treatment Plant Improvements 119-011 <br />i. No bids received, open market <br />ii. Div A-E & Alt 1-4: separate goals 1.2% MBE, 4.3% WBE <br /> <br />9) Morris Performing Arts Center – Main Level Slab Replacement 121-029A <br />i. Goals: 4.1% WBE, 1.8% MBE <br /> <br />10) Ward Bakery Exterior Renovations (ReBid) - 121-061R - Bid Open 12/14/21 <br />i. Bid Package 1 (Masonry) <br />1. Goals - 0.3% MBE, 3.6% WBE <br />ii. Bid Package 2 (Doors/Windows) <br />1. Goals – 3.4% MBE, 4.5% WBE <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.