Laserfiche WebLink
C. Bid or Quote Phase: <br />1) North Pumping Station FDR (Quote) <br />i. No quotes received on 10/12; moved to open market <br />ii. Goals: 2.8%W and 0.7%M <br /> <br />2) Signal Detection Project (Bid) 120-046 <br />i. JBL Signals and Lighting- $166,254.00 <br />ii. Goals: 4.4% WBE, 1.4% MBE <br />1. MBE: JBL Signals and Lighting $132,754.00 (79.85%) <br />2. WBE: TC Electric $33,500.00 (20.14%) <br /> <br />3) Prairie Avenue Water Main at US 20 Bypass (Bid) <br />i. Low Bidder HRP <br />ii. Goals: 4.8%W and 2%M <br />1. $33,818 M (US Hydro Vac, V&R, C Lee) <br />2. $81,483 W (Slusser’s; TCS) <br /> <br />4) Riverside Drive Bank Stabilization (Bid) - Bid Open 11/23; Bid Award pending <br />budget availability <br />i. Initial review: Milestone Contractors North is the lowest bidder <br />ii. 0.8%W and 0.3%M goals <br />1. $2,700 - 0.33% M (C. Lee Construction); percentages are exceeded <br />2. $9,689 - 1.19% W (State Barricading & Slusser’s); percentages are <br />exceeded <br /> <br />5) 2021 Demolitions 121-036 <br />i. 4 bids received on 11/23: Green Demolition, Indiana Earth, HRP <br />Construction, Ritschard Bros. - all 4 had complete, responsive MWBE forms <br />ii. Award to Green Demolition at 12/14 BPW ($377,220) <br />iii. Goals: 4.7%W, 1.4%M (NAICS 238910 Site Prep) <br />1. MBE: Trucks R Us/Kennedy Expressline $11,316.60 (3%) <br />2. WBE: SAN Corporation $18,861.00 (5%) <br /> <br />6) Airport Annexation Area Water Main Extension <br />i. Bids Opened 11/09/2021 - G.E. Marshall (Low Bid at $313,196.40) <br />ii. Award to G.E. Marshall on 12/14/2021. <br />iii. Goals: 1.55% MBE (Projected 2.97%), 4.45% WBE (Projected 18.80%) <br />1. MBE Participation: DLZ Industrial, LLC (Layout & As-Builts); C. Lee <br />Construction (Asphalt Trucking)