  <br /> <br /> <br />MDA Proposal: «ProjectNumber»     <br /> <br />PROPOSAL  <br />M21-0200 – MLK, JR. COMMUNITY CENTER <br />PRELIMINARY D i S i <br />MDA PROPOSAL <br />6. The Architect shall keep the Owner informed of the status of the jurisdictional review process and anticipated  <br />review schedule. Owner should be aware that a jurisdictional review process is not uniform, nor predicable. State  <br />and local jurisdictions are unique and plans examiners are independent professionals that cannot be influenced  <br />by The Architect or Owner’s personnel. The Architect is not to be held responsible for any delays, to project  <br />schedule, or damages resulting from lengthy review periods by jurisdictional plans examiners, or multiple  <br />requests for information by the same.  <br />  <br />BIDDING & NEGOTIATION PHASE  <br />1. Following the submission and Owner review of the completed Construction Documents, The Architect shall issue  <br />for the Owner the necessary bidding information to the client confirmed bid documents collection location.  <br />2. The Architect shall maintain a list of bidders and facilitate a Pre‐Bid meeting at a time and location chosen by the  <br />Owner.  The Architect will coordinate with the Owner for its bid process requirements.  <br />3. The Architect will maintain and disseminate the approved bidding, and construction start/finish schedule to all  <br />qualified bidders and respond in writing to questions by qualified bidders in a timely fashion.  <br />4. The Architect will respond to RFI’s related to project drawings and specifications.  <br />  <br />CONSTRUCTION ADMINISTRATION PHASE  <br />Periodic site observations will be provided to review the progress of the Work and its compliance with the Contract  <br />Documents. Our services during the construction of the project will include:  <br />1. The Architect will attend the Pre‐Construction Meeting to be facilitated by The Architect and Owner assigned  <br />representative, or The Architect personnel upon Owner’s request.  The Architect shall be responsible for taking  <br />meeting minutes.  <br />2. The Architect shall visit the site at intervals appropriate to the stage of the Contractor’s operations on average of  <br />two (2) site visits per month and as needed, one (1) of which may correspond to monthly progress meetings to  <br />keep the Owner informed about the progress and quality of the portion of the Work completed. The Architect  <br />shall report to the Owner any known deviations from the Contract Documents and from the most recent  <br />construction schedule submitted by the Contractor.  <br />3. The Architect shall review and certify the amounts due to the Contractor and shall issue payment applications in  <br />sum amounts.  <br />4. The Architect shall assist the Owner in collecting lien waivers prior to each payout.  <br />5. The Architect shall review and approve Contractor submittals such as Shop Drawings, Product Data and Samples  <br />(where applicable). We require the traditional ten (10) business days for review of shop drawing submittals to  <br />accommodate accurate, and complete response.  <br />6. The Architect shall issue Supplemental Instructions and Clarifications for minor Changes in the Work, and shall  <br />prepare for the Owner’s approval and execution, Change Orders and Construction Change Directives for major  <br />changes to the work impacting contract time or amount.  <br />7. The Architect shall conduct inspections to determine the date or dates of Substantial completion and the date of  <br />final completion, shall receive from the Contractor and forward to the Owner, for the Owner’s review and records,  <br />written warranties and related documents and shall issue a final Certificate for Payment based upon a final  <br />inspection indicating the Work complies with the requirements of the Contract Documents.  <br />8. Architect shall inform the Owner of work that does not conform to the construction documents.  <br />9. Architect shall not have control over or responsibility for construction means, methods, techniques or sequences  <br />or for safety precautions and programs in association with the work, nor shall the architect be responsible for  <br />Contractor's failure to perform the work in accordance with the contract documents.  <br />10. As‐Built drawings to be provided upon completion of the project.  <br />  <br />  <br />