My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA -Design Srvs. Martin Luther King Jr. Community Dream Center Proj No. 121-066 - Meticulous Design Architecture, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA -Design Srvs. Martin Luther King Jr. Community Dream Center Proj No. 121-066 - Meticulous Design Architecture, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 8:44:17 AM
Creation date
11/10/2021 8:43:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />MDA Proposal: «ProjectNumber» <br /> <br />PROPOSAL <br />M21-0200 – MLK, JR. COMMUNITY CENTER <br />PRELIMINARY D i S i <br />MDA PROPOSAL <br />1. Based on the Schematic Design Documents approved by the Owner and any adjustments authorized by the <br />Owner in the program, schedule or construction budget, the Architect will prepare for approval by the Owner, <br />Design Development Documents consisting of drawings and other documents to fix and describe the size and <br />character of the Project as to architectural, structural, mechanical, and electrical systems, materials and such <br />other elements as may be appropriate. <br />2. The Design Development Drawings are to include: Plan details, Section details, Preliminary Finish Schedule, <br />Preliminary Door and Window Schedules, and Outline Specification (where applicable). <br />3. Architecturally, we will conduct a preliminary code review on the building in accordance with the current edition <br />of the International Building Code and governing jurisdictional codes relative to the Design Development Phase <br />of the project. <br />4. The Architect shall prepare Design Development Pricing Documents from which an estimate of the cost of <br />construction shall be prepared. In the absence of an owner contractor, the Architect may prepare an Architects <br />Design Estimate based on industry data for construction costs by square footage. This estimate may vary as the <br />project progresses due to changes in the Scope or Quality of Construction and/or changes in the Time of <br />Construction. The Architect shall endeavor to advise the Owner of such variations but shall not be required to <br />quantify the changes on behalf of the Owner’s contractor(s). Unless certified by the Owner’s Contractor(s) any <br />estimate prepared by the Architect is considered neither a fixed limit of construction cost nor a guarantee of such <br />costs. <br />5. The Architect shall present the Owner with their evaluation of the project and discuss alternative approaches to <br />design and construction including the feasibility of incorporating environmentally responsible design into the <br />project. The Architect shall reach an understanding on the scope and requirements of the project to proceed <br />forward with. <br />6. The Architect shall advise the Owner of any adjustments to the preliminary estimates of Construction Cost based <br />on the Cost Consultant updated report. <br />7. The Architect will conduct a page turn review with the Client to obtain comments and notice to proceed for the <br />Construction Documents Phase. <br /> <br />CONSTRUCTION DOCUMENTS PHASE <br />We will prepare construction documents for the facility in accordance with Federal, State and Local design guidelines. <br />The construction documents will be presented at a larger scale (24" x 36" or 30” x 42”) illustrating in detail the scope, <br />specifications, and design intent for the construction of the approved design. Final drawings and specifications source <br />files (PDF, DWG, Revit, and MS Word) to be provided to the client for record. 11”x17” size prints of drawings can be <br />provided to the client if required. Construction Documents phase will include the following: <br />1. Based on the approved Design Development Documents any further adjustments in the scope or quality of the <br />Project or changes in the construction budget authorized by the Owner, the Architect shall prepare for approval <br />by the Owner the necessary Contract Documents consisting of Drawings and Specifications setting forth in detail <br />the requirements for the construction of the Project. <br />2. The Architect shall advise the Owner of any adjustments to previous preliminary estimates of Construction Cost <br />indicated by changes in requirement or general market conditions with the assistance of the Owner’s <br />contractor(s) where applicable. <br />3. In the event that outside and/or specialty consultants (Environmental Engineers, furniture designers, zoning, etc.) <br />for unseen conditions, or for specific design conditions beyond the agreed upon scope of work not specifically <br />outlined in this proposal are found to be required, the Architect shall present to the Owner for the Owners <br />approval, proposals for completion of such work as additional services, or to be provided by outside consultants <br />if not applicable to the Architect. If approved by the Owner, the Architect shall coordinate the work of the <br />consultants and include any required drawings and specifications within the Architect’s Contract Documents. <br />4. The Architect shall submit on behalf of the Owner in connection with the Owner’s responsibility to assist for filing <br />documents required for the approval of governmental authorities having jurisdiction over the Project. <br />5. The Architect, with the Owner’s assistance shall provide responses to the plans examiner, review/revise drawings, <br />provide clarifications, and develop wall sections and construction details as requested by the plans examiner <br />within the reasonable scope of the permitting process.
The URL can be used to link to this page
Your browser does not support the video tag.