Laserfiche WebLink
121-029 - Morris Performing Arts Center Page 5 of 9 <br />Frost Engineering & Consulting Company OUR MISSION IS SIMPLE <br />© Copyright 2005. All rights reserved. BE THE BEST! <br />post construct ion scan of the main level of the theater including the <br />Foyer and Theater seating areas. <br />e.Deliverables include side by side image comparisons of the existing <br />conditions compared to the space post construction. The comparisons <br />will highlight the primary improvements that were completed as a part of <br />this project. <br />Services exclude the following: <br />1.Design of the chair attachments and chair layout including required sight lines <br />2.Chair removal is not included and shall be completed prior to any constructi on <br />activities Chair removal other than chairs located in the main level where the slab <br />replacement is occurring. <br />3.The existing concrete stem walls are assumed adequate for support of the <br />proposed new slab. Review and approval of existing conditions are excluded from <br />the current scope. <br />4.Design of temporary support during construction for any existing utilities currently <br />hung from the existing slab that are planned to remain. <br />5.Major plan layout revisions or adjustments requested after submittal of the design <br />basis documents that would necessitate framing revisions or member redesigns. <br />Minor adjustments noted on the approved design basis submittal will be <br />incorporated into the final construction documents. <br />6.Submission of a calculations package <br />7.Meetings not outlined above. <br />8.Cost engineering, if required, following results of the bid openings. <br />9.Table and chair selection for the elevated seating platforms. <br />10.Any work on the balcony level other the design for connecting the new illuminated <br />seats to the existing electrical infrastructure. <br />Submittal of Bidding and Construction Plans and Documents shall be under seal of an <br />Indiana Professional Engineer. <br />MORRIS THEATER ATTIC CATWALK DESIGN <br />Services will include: <br />1.Study and Report Phase ($17,900) <br />a.Tasks noted in Section A1.01. <br />b.Review of provided existing building documents <br />c.Maximum of one site visit with a maximum of three structural engineers <br />from FEC to be coordinated with the Morris Theater Operations Team to <br />confirm the current and intended use of the catwalk and perform a <br />detailed inspection of the existing frame to confirm member sizing <br />matches that shown on the provid ed existing plans. <br />2.Preliminary Design Phase ($22,790) <br />a.Tasks noted in Section A1.02 <br />b.Catwalk design including member and deck design, connections to the <br />existing roof framing, and reinforcing details as required. <br />3.Final Design Phase ($8,440) <br />a.Tasks noted in Section A1.03 <br />$68,930.00