Laserfiche WebLink
Honeywell Groundwater Remediation Industrial Wastewater Discharge Permit page 11 of 39 <br />A.3. The permittee shall be responsible for all requirements and information in correspondence <br />directed to the attention of this designated individual, including but not limited to due dates. <br /> <br />a. Should the permittee wish to change the Authorized Representative responsible to <br />receive correspondence from the Control Authority a written designation must be <br />submitted to the Control Authority indicating the name of the new Authorized <br />Representative designated to receive compliance correspondence, their position in the <br />company, a statement that they meet the requirements in Part IV (B) (15) of this permit, <br />complete contact information, and an effective date of this designation.