Laserfiche WebLink
Honeywell Groundwater Remediation Industrial Wastewater Discharge Permit page 10 of 39 <br /> <br />H. Flow Measurement Devices 1.The permittee shall submit a Flow Measurement Plan (FMP) within 90 days of the issuance of this <br />permit or report as to whether the existing plan is still being implemented. The FMP shall <br />describe, at a minimum, how the permittee will measure and record water and wastewater flow <br />in their facility, including how wastewater discharged to the sewer will be measured, and shall <br />include the certification statement found in Part III (A) (4) signed by the Authorized Representative [see <br />Part IV (B) (15)]. <br /> <br />2.When internal process flow measurement is requested by the Director, the FMP shall also describe how <br />the flow of any internal processes will be measured. The FMP shall be subject to review by the <br />Control Authority. <br /> <br />3.The permittee shall measure and report the wastewater discharge flow for the duration of each <br />sampling event. Totalized daily flows shall also be submitted with the Periodic Compliance <br />Report (PCR). For batch discharges, the permittee shall report the date and the volume of each <br />and every batch discharge. Each PCR shall include all flow measurements for the entire <br />monitoring period covered in the report. <br /> <br />4.The permittee shall calibrate any flow measurement device as needed, but no less than once <br />annually. The calibration shall be performed by a qualified individual, with the appropriate <br />equipment, and by a method acceptable to the Control Authority. The permittee shall submit all <br />records of calibration to the Control Authority. <br /> <br />5.Spare level sensing and totalizing/recording instrumentation, and sampling repair parts shall be <br />available for immediate installation upon discovery that flow measurement devices are not <br />operating properly, or as described in the FMP. <br /> <br />6.The permittee shall not, at any time, remove, alter, or change any of the flow measurement devices <br />described in the FMP. Any proposed change to the FMP shall be submitted to the Control <br />Authority for approval. If the permittee is unable to measure flow as described in the FMP, the <br />permittee shall immediately notify the Control Authority. <br /> <br />I. Reporting Information and Correspondence with the Permittee <br /> <br />1.Unless otherwise provided in this permit, all correspondence related to this wastewater discharge <br />permit shall be sent to the Control Authority at this address: <br /> <br />City of South Bend <br />Division of Environmental Services <br />Industrial Pretreatment Group <br />3113 Riverside Dr. <br />South Bend IN 46628 <br /> <br />2.In the event that an oral notification is required due to a spill or slug to the sewer, or other <br />emergency, the permittee shall call 574-277-8515 and dial zero (0) to reach an operator. <br /> <br />3.All correspondence from the Control Authority to the permittee regarding compliance with this <br />permit will be directed to the Authorized Representative identified in the application in Question