My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Discharge Permit Renewal - Honeywell International, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Licenses & Permits
>
Industrial Wastewater Discharge Permit Renewal - Honeywell International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:20:00 PM
Creation date
9/14/2021 3:19:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Recommendations
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Honeywell Groundwater Remediation Industrial Wastewater Discharge Permit page 10 of 39 <br /> <br />H. Flow Measurement Devices 1.The permittee shall submit a Flow Measurement Plan (FMP) within 90 days of the issuance of this <br />permit or report as to whether the existing plan is still being implemented. The FMP shall <br />describe, at a minimum, how the permittee will measure and record water and wastewater flow <br />in their facility, including how wastewater discharged to the sewer will be measured, and shall <br />include the certification statement found in Part III (A) (4) signed by the Authorized Representative [see <br />Part IV (B) (15)]. <br /> <br />2.When internal process flow measurement is requested by the Director, the FMP shall also describe how <br />the flow of any internal processes will be measured. The FMP shall be subject to review by the <br />Control Authority. <br /> <br />3.The permittee shall measure and report the wastewater discharge flow for the duration of each <br />sampling event. Totalized daily flows shall also be submitted with the Periodic Compliance <br />Report (PCR). For batch discharges, the permittee shall report the date and the volume of each <br />and every batch discharge. Each PCR shall include all flow measurements for the entire <br />monitoring period covered in the report. <br /> <br />4.The permittee shall calibrate any flow measurement device as needed, but no less than once <br />annually. The calibration shall be performed by a qualified individual, with the appropriate <br />equipment, and by a method acceptable to the Control Authority. The permittee shall submit all <br />records of calibration to the Control Authority. <br /> <br />5.Spare level sensing and totalizing/recording instrumentation, and sampling repair parts shall be <br />available for immediate installation upon discovery that flow measurement devices are not <br />operating properly, or as described in the FMP. <br /> <br />6.The permittee shall not, at any time, remove, alter, or change any of the flow measurement devices <br />described in the FMP. Any proposed change to the FMP shall be submitted to the Control <br />Authority for approval. If the permittee is unable to measure flow as described in the FMP, the <br />permittee shall immediately notify the Control Authority. <br /> <br />I. Reporting Information and Correspondence with the Permittee <br /> <br />1.Unless otherwise provided in this permit, all correspondence related to this wastewater discharge <br />permit shall be sent to the Control Authority at this address: <br /> <br />City of South Bend <br />Division of Environmental Services <br />Industrial Pretreatment Group <br />3113 Riverside Dr. <br />South Bend IN 46628 <br /> <br />2.In the event that an oral notification is required due to a spill or slug to the sewer, or other <br />emergency, the permittee shall call 574-277-8515 and dial zero (0) to reach an operator. <br /> <br />3.All correspondence from the Control Authority to the permittee regarding compliance with this <br />permit will be directed to the Authorized Representative identified in the application in Question
The URL can be used to link to this page
Your browser does not support the video tag.