My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:54:43 PM
Creation date
9/14/2021 2:54:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 9HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW <br />RELEVANT EXPERIENCE: HWC <br />HWC is responsible for full time inspection of the reconstruction of Olive Street in <br />South Bend, IN. <br />The project includes the removal of the existing roadway and reconstructing it with <br />QC/QA concrete due to the extensive truck traffic. This project includes excavation <br />for roadways, subgrade treatment, QC/QA PCCP paving, QC/QA asphalt paving, <br />storm sewer, sanitary sewer reconnections, water main service reconnections, lighting, <br />striping and signage. This project also includes tie-in approaches to State Road 23. <br />This LPA project is being funded by the City of South Bend and INDOT. Project cost is <br />anticipated to be $3.5 million. <br />The project is expected to be substantially complete in October of 2021. <br />Chris Holth is managing this project for HWC. <br />HWC was responsible for full time construction inspection of a streetscape along <br />Western Avenue in South Bend. Scope included earthwork, asphalt and concrete <br />pavement, sidewalks, permeable pavers, storm sewer separation, water main, <br />landscaping and lighting. <br />A new 12” water main was installed with new service lines to businesses in this area. <br />A new storm sewer was installed to separate it from the existing combined sanitary <br />sewer. <br />Beautification was added by installing decorative lighting, permeable paver parking <br />areas and walk areas and planting trees and shrubs. Benches and bike racks were <br />also added throughout the site. <br />This project was completed in November 2019 at a cost of $2.6 million. <br />Chris Holth managed this project for HWC. <br />Western Avenue Streetscape Phase III <br />South Bend, IN <br />Olive Street Phase I <br />South Bend, IN
The URL can be used to link to this page
Your browser does not support the video tag.