My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:54:43 PM
Creation date
9/14/2021 2:54:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 11HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW <br />RELEVANT EXPERIENCE: HWC <br />HWC provided construction inspection services for the Allisonville Road <br />Reconstruction from 126th Street to 131st Street project in Fishers, Indiana. <br />The project turned a two-lane roadway into a four-lane roadway with added turn <br />lanes at the two signalized intersections. The project included replacement of a <br />three-sided structure over Shoemaker Ditch, full-depth pavement replacement with <br />added curbs, drainage system and a multi-use path. The project also included <br />intersection improvements with updated signals and pedestrian crossings and <br />lighting additions throughout the corridor. <br />This $9.2 million LPA project was funded by the City of Fishers and the Indiana <br />Department of Transportation. This project was completed in September 2019. <br />HWC was responsible for full-time inspection of the Wheeling Avenue project in <br />Muncie, Indiana. <br />This project included both resurfaced and fully reconstructed sections of roadway <br />with widening. New signage and traffic signals were placed. New sidewalk and <br />corresponding drive approaches, curb, and ADA ramps were installed on the east <br />and west sides of Wheeling Avenue. New storm sewer pipe and structures were <br />installed throughout project limits. <br />The project was funded by INDOT and the City of Muncie. The project cost was <br />$4.25 million. The project was completed in May 2021. <br /> <br />Wheeling Avenue Reconstruction <br />Muncie, IN <br />Allisonville Rd Reconstruction from 126th St. to 131st St. <br />Fishers, IN
The URL can be used to link to this page
Your browser does not support the video tag.