Laserfiche WebLink
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 12HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW <br />RELEVANT EXPERIENCE: HWC <br />HWC was responsible for the inspection for the construction of Phase IV of the King <br />Street Rehabilitation project in Franklin, Indiana. This project was a portion of the <br />overall Franklin Gateway corridor into downtown Franklin. <br />This project included both full depth and partial depth PCCP patching. A fiberglass <br />geogrid was then placed atop the concrete pavement and the entire corridor <br />received three lifts of asphalt. Other project dynamics included new concrete curb <br />and gutter, storm sewer, decorative lighting, striping, a new HMA trail, and several <br />decorative trail nodes with unique aesthetic features. Limestone blocks, trees, sod <br />and irrigation were added along the roadway to complete the overall look of the <br />corridor. <br />This LPA project was funded by the City of Franklin and INDOT, and the project cost <br />was $4.53 million. <br />McCormick provided subconsultant observation services for $5.6 million intersection <br />improvement project. The project included concrete pavement sections, the addition <br />of turn lanes, new storm sewers, and other drainage features, and upgraded <br />signalization and lighting. <br />They also observed daily construction activities for compliance with construction <br />plans and technical specifications, prepared Daily Work Report in SiteManager to <br />account for quantity and location of items placed, tested concrete and subgrade <br />treatment, and attended bi-weekly progress meetings.. <br />McKinley Road & Ash Road <br />St. Joseph, IN <br />King Street, Phase IV Road Rehabilitation <br />Franklin, IN