My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:54:43 PM
Creation date
9/14/2021 2:54:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 12HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW <br />RELEVANT EXPERIENCE: HWC <br />HWC was responsible for the inspection for the construction of Phase IV of the King <br />Street Rehabilitation project in Franklin, Indiana. This project was a portion of the <br />overall Franklin Gateway corridor into downtown Franklin. <br />This project included both full depth and partial depth PCCP patching. A fiberglass <br />geogrid was then placed atop the concrete pavement and the entire corridor <br />received three lifts of asphalt. Other project dynamics included new concrete curb <br />and gutter, storm sewer, decorative lighting, striping, a new HMA trail, and several <br />decorative trail nodes with unique aesthetic features. Limestone blocks, trees, sod <br />and irrigation were added along the roadway to complete the overall look of the <br />corridor. <br />This LPA project was funded by the City of Franklin and INDOT, and the project cost <br />was $4.53 million. <br />McCormick provided subconsultant observation services for $5.6 million intersection <br />improvement project. The project included concrete pavement sections, the addition <br />of turn lanes, new storm sewers, and other drainage features, and upgraded <br />signalization and lighting. <br />They also observed daily construction activities for compliance with construction <br />plans and technical specifications, prepared Daily Work Report in SiteManager to <br />account for quantity and location of items placed, tested concrete and subgrade <br />treatment, and attended bi-weekly progress meetings.. <br />McKinley Road & Ash Road <br />St. Joseph, IN <br />King Street, Phase IV Road Rehabilitation <br />Franklin, IN
The URL can be used to link to this page
Your browser does not support the video tag.