Laserfiche WebLink
City of South Bend | Olive Street Phase 2 Road Improvements | Construction Inspection Services | 10 <br />PROJECT <br />EXPERIENCE <br />DLZ professionals strive to provide <br />unmatched client service while <br />meeting all of a project’s objectives. <br />The firm’s engineers, architects, <br />planners, and technical support <br />staff are innovative and understand <br />that every project is different. <br />The professionals at DLZ have the <br />experience and expertise to realize <br />that each client’s needs and wants <br />are unique. We approach each <br />project with this in mind and we <br />stand behind the work that we do. <br />LASALLE TRAIL, PHASE III <br />St. Joseph County, Indiana <br />DLZ provided construction inspection services <br />for the extension of the LaSalle Trail shared use <br />path from Auten Road to the Indiana/Michigan <br />State Line. Work included construction of ADA <br />compliant infrastructure with trail being 10 feet <br />wide and hard-surfaced concrete pavement <br />with 2-foot shoulders. The length of the path is <br />5,700 feet. <br />The path follows the alignment on the existing <br />former railroad bed and aligns with the trail <br />from the previous phase, LaSalle Trail Phase <br />II. Coordination was required to align the path <br />from the south side of State Line Road to the <br />north side with the existing IN-MI River Valley <br />Trail. <br />TAMARACK TRAIL <br />North Liberty, Indiana <br />Construction inspection services were <br />provided for the construction of a new <br />4,600-foot asphalt trail from Quinn Road <br />to Wabash Avenue. The trail connects <br />the North Liberty Community Center to <br />the North Liberty Youth League Ballpark <br />along the abandoned railroad corridor <br />(formerly Indiana, Illinois, and Iowa <br />Railroad). Approximately 2,200 feet of <br />woods were cleared as part of the project. <br />Construction of the project also included <br />subgrade treatment, compacted aggregate, <br />and seeding. Coordination for the project <br />included maintenance of traffic, staging of <br />construction, construction schedule, and <br />material testing.