My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Olive St. Pavement Reconstruction, Phase II Proj No. 114-064 - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:54:30 PM
Creation date
9/14/2021 2:53:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | Olive Street Phase 2 Road Improvements | Construction Inspection Services | 11 <br />INDOT CONTRACT B-36229, <br />45TH STREET GRADE SEPARATION <br />Munster, Indiana <br />DLZ provided project management, <br />construction administration and inspection <br />services for a new grade-separated crossing <br />with the Canadian National Railroad. The <br />project involved a temporary railroad <br />shoofly, earth retaining system, 45th Street <br />realignment, Calumet Avenue reconstruction, <br />1,250 feet of HMA multi-use trail, a new steel <br />pedestrian bridge, and new lift station and <br />permanent dewatering system. <br />INDOT CONTRACT R-37320, <br />RYAN/BRUICK ROAD RECONSTRUCTION <br />Allen County, Indiana <br />DLZ provided construction inspection <br />services for new roadway. The new road <br />provided 12 foot travel lanes (one per <br />direction) with 10 foot wide shoulders. <br />However, the County requested that the profile <br />and alignment be designed so that when <br />additional capacity was needed, the roadway <br />could easily be converted to a four-lane curbed <br />and gutter facility. The project included the <br />analysis of existing ditches and the design of <br />new roadside ditches to provide the capacity <br />necessary to transport the stormwater runoff <br />from the proposed improvements and the <br />anticipated development along the corridor. <br />The intricate drainage design utilizes new <br />culverts and an enclosed storm sewer system <br />to collect and convey the drainage to the outfall <br />location, located north of Bremer Road to the <br />Bandalier Ditch. Also, relocation of 2,300 feet <br />of the Bandalier ditch along Ryan Road from <br />Harper Road south to the northern set of the <br />Norfolk Southern Railroad tracks. <br />GARY/CHICAGO INTERNATIONAL <br />AIRPORT RUNWAY 12/30 EXTENSION <br />Gary, Indiana <br />DLZ provided program construction <br />management services for railroad relocation <br />and highway bridge construction. The project <br />included the following: <br />• Coordination with CD, NS, CSX Railroads <br />and various utility relocations. <br />• Construction Contract Administration <br />• Construction Coordination <br />• Quality Assurance <br />• Field Coordination and Inspection <br />• Construction Progress Documentation and <br />Reporting <br />• Construction Claims Prevention <br />• Maintenance of Record Drawings and <br />Associated Information <br />• Construction Closeout Support <br />• Safety Reviews
The URL can be used to link to this page
Your browser does not support the video tag.