Laserfiche WebLink
REGULAR MEETING JULY 13, 2021 133 <br />contract approved as outlined above. Mr. Gathers seconded the motion, which carried by roll <br />call. Mr. Gilot inquired about the higher Associated Fees for this property, and Ms. Maradik <br />clarified that since Mr. Lopez is not the adjacent property owner, there are additional costs for <br />appraisal of the property, as outlined in state statute. <br />AWARD BID AND APPROVE CONTRACT — MAYFLOWER ROAD AND SAMPLE ST. <br />TRAFFIC IMPROVEMENTS — PROJECT NO. 120-052R (PR-00009454) <br />Ms. Leslie Biek, Engineering, advised the Board that on June 22, 2021, bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Biek recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Milestone <br />Contractors North, Inc., 24358 State Road 23, South Bend, IN 46614, in the amount of <br />$347,636.15. Therefore, Mr. Molnar made a motion that the recommendation be accepted, and <br />the bid be awarded, and the contract approved as outlined above. Mr. Gathers seconded the <br />motion, which carried by roll call. <br />APPROVE CHANGE ORDER NO. 1 — SHERIDAN ST. AND SAMPLE ST. SIGNAL <br />IMPROVEMENTS —PROJECT NO. 116-127 (PO-0006099) <br />Ms. Maradik advised that Ms. Leslie Biek, Engineering, has submitted Change Order No. 1 on <br />behalf of Rieth-Riley Construction Co., Inc, 25200 State Road 23, South Bend, IN 46614, <br />indicating the contract amount be increased by $13,195.86 for a new contract sum, including this <br />Change Order, in the amount of $438,644.78. Upon a motion made by Mr. Molnar, seconded by <br />Mr. Gathers and carried, the Change Order was approved by roll call. <br />APPROVE CHANGE ORDER NO.2 — EAGLE WAY SEWER EXTENSION — PROJECT NO. <br />119-095 (PO-0006601) <br />Ms. Maradik advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 2 on <br />behalf of Indiana Earth, Inc., 10343 McKinley Hwy., Osceola, IN 46561, indicating the contract <br />amount be decreased by $14,477.33 for a new contract sum, including this Change Order, in the <br />amount of $253,704.23. Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and <br />carried by roll call, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — SEITZ PARK RECONSTRUCTION, PHASE I — <br />PROJECT NO. 117-093A (PO-0006342) <br />Ms. Maradik advised that Ms. Sue Ellen Doudrick, Engineering, has submitted Change Order <br />No. 1 on behalf of Ziolkowski Construction, Inc., 4050 Ralph Jones Dr., South Bend, IN 46628, <br />indicating the contract amount be decreased by $22,975.57 for a new contract sum, including this <br />Change Order, in the amount of $7,115,429.78. Upon a motion made by Mr. Molnar, seconded <br />by Mr. Gathers and carried by roll call, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— EL CAMPITO WATER TAP QUOTE — PROJECT NO. 121-017 (PO-0008426) <br />Ms. Maradik advised that Mr. Finnan Cavanaugh, Engineering, has submitted Change Order <br />No. 1 (Final) on behalf of Selge Construction Inc. 2833 South 11TH St., Niles, MI 49120, <br />indicating the contract amount be decreased by $2,400 for a new contract sum, including this <br />Change Order, of $15,325. Also submitted was the Project Completion Affidavit indicating this <br />new final cost of $15,325. Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and <br />carried by roll call, Change Order No. 1 (Final) and the Project Completion Affidavit were <br />approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — DUBAIL AVENUE STREETSCAPE — PROJECT NO. 120-009 (PR-00010336) <br />In a memorandum to the Board, Ms. Charlotte Brach, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Mr. Molnar, seconded by <br />Mr. Gathers and carried by roll call, the above request to advertise was approved, and the Title <br />Sheet was approved and signed. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — POLICE DEPARTMENT HEADQUARTERS ROOF REHABILITATION & <br />REPLACEMENT —PROJECT NO. 119-080 (PR-00010330) <br />In a memorandum to the Board, Ms. Leslie Biek, Engineering, requested permission to advertise <br />for the receipt of bids for the above referenced project. Also presented at this time for approval <br />