Laserfiche WebLink
REGULAR MEETING <br />JULY 13, 2021 131 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />4050 Ralph Jones Dr. <br />South Bend, IN 46628 <br />kkromer@zbuild.com <br />Bid was signed by Mr. Bill Favors <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Form MWBE-2.0 Evidence of Good Faith Efforts was completed. <br />n <br />Item <br />Description <br />Quantity <br />Unit <br />Total <br />No. <br />1 <br />Demolition clearing & <br />1 <br />LS <br />$250,000.00 <br />grubbing, grading, site <br />preparation, and <br />miscellaneous to complete <br />the work. <br />2 <br />Site Utilities, piping, below <br />1 <br />LS <br />$325,000.00 <br />grade storage, bedding, <br />backfill, testing, taps, <br />fittings, valves, structures, <br />and miscellaneous to <br />com lete work. <br />3 <br />Concrete, curbs, sidewalks, <br />1 <br />LS <br />$200,000.00 <br />ADA ramps, approach, frost <br />slabs, and miscellaneous to <br />complete work. <br />4 <br />Asphalt paving, pavements <br />1 <br />LS <br />$94,000.00 <br />markings, subgrade <br />preparation, aggregates, etc. <br />and miscellaneous to <br />complete work. <br />5 <br />Landscape <br />1 <br />LS <br />$94,000.00 <br />6 <br />Playground <br />1 <br />LS <br />$94,000.00 <br />7 <br />Courtyard Walls and Gates <br />1 <br />LS <br />$75,000.00 <br />8 <br />Allowance: Storage Shed <br />1 <br />LS <br />$18,000.00 <br />refer to Section XXV <br />Total Base Bid <br />$1,150,000.00 <br />Alternate #01 <br />$16,000.00 <br />Base Bid Total $1,150,000.00 <br />DOES NOT INCLUDE ALTERNATE #01 <br />THE ROBERT HENRY CORPORATION <br />404 S. Frances St. <br />South Bend, IN 46617 <br />jhiss@roberthenrycotp.com <br />Bid was signed by Mr. Brian S. Henry <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Form MWBE-2.0 Evidence of Good Faith Efforts was completed. <br />9 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Total <br />1 <br />Demolition clearing & <br />1 <br />LS <br />$248,000.00 <br />grubbing, grading, site <br />preparation, and <br />miscellaneous to complete <br />the work. <br />2 <br />Site Utilities, piping, below <br />1 <br />LS <br />$283,255.00 <br />grade storage, bedding, <br />backfill, testing, taps, <br />