REGULAR MEETING
<br />JULY 13, 2021 131
<br />ZIOLKOWSKI CONSTRUCTION, INC.
<br />4050 Ralph Jones Dr.
<br />South Bend, IN 46628
<br />kkromer@zbuild.com
<br />Bid was signed by Mr. Bill Favors
<br />Non -Collusion, Non -Discrimination Affidavit Form was completed.
<br />Five percent (5%) Bid Bond was submitted.
<br />Form MWBE-2.0 Evidence of Good Faith Efforts was completed.
<br />n
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Total
<br />No.
<br />1
<br />Demolition clearing &
<br />1
<br />LS
<br />$250,000.00
<br />grubbing, grading, site
<br />preparation, and
<br />miscellaneous to complete
<br />the work.
<br />2
<br />Site Utilities, piping, below
<br />1
<br />LS
<br />$325,000.00
<br />grade storage, bedding,
<br />backfill, testing, taps,
<br />fittings, valves, structures,
<br />and miscellaneous to
<br />com lete work.
<br />3
<br />Concrete, curbs, sidewalks,
<br />1
<br />LS
<br />$200,000.00
<br />ADA ramps, approach, frost
<br />slabs, and miscellaneous to
<br />complete work.
<br />4
<br />Asphalt paving, pavements
<br />1
<br />LS
<br />$94,000.00
<br />markings, subgrade
<br />preparation, aggregates, etc.
<br />and miscellaneous to
<br />complete work.
<br />5
<br />Landscape
<br />1
<br />LS
<br />$94,000.00
<br />6
<br />Playground
<br />1
<br />LS
<br />$94,000.00
<br />7
<br />Courtyard Walls and Gates
<br />1
<br />LS
<br />$75,000.00
<br />8
<br />Allowance: Storage Shed
<br />1
<br />LS
<br />$18,000.00
<br />refer to Section XXV
<br />Total Base Bid
<br />$1,150,000.00
<br />Alternate #01
<br />$16,000.00
<br />Base Bid Total $1,150,000.00
<br />DOES NOT INCLUDE ALTERNATE #01
<br />THE ROBERT HENRY CORPORATION
<br />404 S. Frances St.
<br />South Bend, IN 46617
<br />jhiss@roberthenrycotp.com
<br />Bid was signed by Mr. Brian S. Henry
<br />Non -Collusion, Non -Discrimination Affidavit Form was completed.
<br />Five percent (5%) Bid Bond was submitted.
<br />Form MWBE-2.0 Evidence of Good Faith Efforts was completed.
<br />9
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Total
<br />1
<br />Demolition clearing &
<br />1
<br />LS
<br />$248,000.00
<br />grubbing, grading, site
<br />preparation, and
<br />miscellaneous to complete
<br />the work.
<br />2
<br />Site Utilities, piping, below
<br />1
<br />LS
<br />$283,255.00
<br />grade storage, bedding,
<br />backfill, testing, taps,
<br />
|