My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 4:32:41 PM
Creation date
7/13/2021 4:31:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 2/14/2020 Page - 9 Public Works Quote <br />XXI. SCOPE OF WORK <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 104.02 <br />B. Additions: <br /> <br />1. The Bidder shall verify existing site conditions prior to Bid/Quote submission to preclude a stoppage <br />of work due to “Differing Site Conditions”. <br />2. The Contractor shall take special care to protect existing facilities adjacent to the limits of the active <br />work areas shown on the Plans. Any scope required to repair existing curb, sidewalk, pavement, <br />or other items not indicated for removal on the Plans that are damaged by the Contractor shall be <br />repaired by the Contractor but shall be considered incidental to the work and not paid for directly. <br /> <br />XXII. PRECONSTRUCTION CONFERENCE <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. After quote award and prior to the initiation of work at the site, the Contractor and Owner shall hold <br />a Preconstruction Conference. <br />2. In addition to any other documentation required by the Owner, the selected Contractor shall submit <br />the following information to the City prior to the Preconstruction Conference: <br />a. Prior to the start of any Work under this project, Contractor shall make available to Owner all <br />equipment that is to be utilized in the execution of this contract. Owner will hold a <br />preconstruction conference at which the sequence of work, methods, inspection, and <br />monitoring requirements and debris disposal shall be discussed. <br />b. Designated personnel shall be field certified NASSCO (National Association of Sewer Service <br />Companies) technicians certified by passing the three-day Pipeline Assessment and <br />Certification Program. Contractor shall submit documentation of certifications of all staff to be <br />assigned to the project. <br />c. A description of the method used to prevent passage of debris to downstream sewers. <br />d. A description of the method of disposal of sewer pipe cleaning debris. <br />e. Equipment storage location for off-hours and weekends. <br />f. Construction dewatering process, equipment and plan <br />g. Documentation on any chemicals anticipated to be used on the project, including at a minimum, <br />material safety data sheets. <br />h. Phone numbers of the personnel used for emergency and off-hours inquiries or calls. <br /> <br />XXIII. MOBILIZATION AND DEMOBILIZATION <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 110 <br />B. Additions: <br /> <br />1. Payment will be made under: <br />Pay Item Pay Unit <br />Mobilization and Demobilization LS <br /> <br />XXIV. CLEARING OPERATIONS <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 201 <br />B. Additions: <br /> <br />1. “Clearing and Grubbing” shall consist of clearing, grubbing, removing and disposing of all <br />vegetation, debris and other man-made materials required to perform the work indicated in the <br />Plans and Contract Documents, but not specifically paid for otherwise. <br />2. This Pay Item shall include the removal of all trees and grinding of stumps within the perimeter of <br />the existing fenced pond area which are not otherwise designated on the Plans to be preserved. <br />3. Disposal of debris resulting from clearing or removal operations shall be at an off-site area, <br />provided by the Contractor and approved by the Owner. No debris shall be left overnight.
The URL can be used to link to this page
Your browser does not support the video tag.