Change Order No 1 - Wastewater Treatment Plant Final Clarifiers 4-5 - Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 1 - Wastewater Treatment Plant Final Clarifiers 4-5 - Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 1:29:15 PM
Creation date
5/20/2021 1:29:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDC® C-941, Change Order. <br />Prepared and published 2013 by the Engineers Joint Contract Documents Committee. <br />Page 1 of 1 <br />Change Order No.001 <br />Date of Issuance:April 26, 2021 Effective Date: April 26, 2021 <br />Owner:City of South Bend Owner's Contract No.:119-069A <br />Contractor:Bowen Engineering Contractor’s Project No.: <br />Engineer:Arcadis US Engineer's Project No.:30029091 <br />Project:WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 <br />and Disinfection Improvements (119-069A) <br />Contract Name: <br />The Contract is modified as follows upon execution of this Change Order: <br />Description: <br />1. Provide epoxy coating of the existing steel embedded plates at Final Clarifier Nos. 4 & 5. This proposal <br />pertains to the 19 areas around each tank for a total of 38 locations in Final Clarifier Nos. 4 & 5. <br />2. Ovivo will redesign and fabricate new equipment column and sludge duct around existing RAS <br />opening <br />Attachments: Contractor’s Change Order Proposals <br />CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES <br />Original Contract Price:Original Contract Times: <br />Substantial Completion: April 17,2022 <br />$ 4,272,999 Ready for Final Payment: May 17,2022 dates <br />No Change from previously approved Change Orders:No Change from previously approved Change Orders: <br />Substantial Completion: 0 <br />$0.00 Ready for Final Payment: 0 days <br />Contract Price prior to this Change Order:Contract Times prior to this Change Order: <br />Substantial Completion: April 17,2022 <br />$4,272,999 Ready for Final Payment: May 17,2022 dates <br />Increase of this Change Order:Increase of this Change Order: <br />Substantial Completion: 0 <br />$50,136.93 Ready for Final Payment: 0 days <br />Contract Price incorporating this Change Order:Contract Times with all approved Change Orders: <br />Substantial Completion: April 17,2022 <br />$4,323,135.93 Ready for Final Payment: May 17,2022 dates <br />RECOMMENDED:ACCEPTED:ACCEPTED: <br />By: By: By: <br />Engineer Owner (Authorized Signature) Contractor (Authorized Signature) <br />Title: Title <br />: <br />Title <br />:Date: Date <br />: <br />Date <br />: <br />Project Engineer <br />4/26/2021 <br />Nick Isenhower <br />Project Engineer <br />4/27/202104-28-2021 <br />Assistant City Engineer