My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Wastewater Treatment Plant Final Clarifiers 4-5 - Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 1 - Wastewater Treatment Plant Final Clarifiers 4-5 - Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 1:29:15 PM
Creation date
5/20/2021 1:29:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE:4/26/2021 <br />PROJECT NO:119-069A <br />PROJECT NAME:WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 and <br />Disinfection Improvements (119-069A) <br />CONTRACT DATE:11/13/2020 Notice to Proceed <br />CHANGE ORDER NO.001 <br />SUBJECT OF CHANGE ORDER:Provide epoxy coating of the existing steel embedded plates at <br />Final Clarifier Nos. 4 & 5. Ovivo will redesign and fabricate new <br />equipment column and sludge duct around existing RAS <br />Opening for Final Clarifier No. 4. <br />All items completed substantially as planned. <br />See attached Comparison of Estimate for overruns and underruns. <br />The original contract sum $ 4,272,999.00 <br />Net change by previously authorized change orders $0.00 <br />The contract sum prior to this change order $ 4,272,999.00 <br />By this Change Order, the project amount is Increased <br /> Decreased $ 50,136.93 <br />The new contract sum including this change order $ 4,323,135.93 <br />This Change Order represents a total change of 1.17 % <br />Total change for entire project 1.17 % <br />Original contracted completion date/time 05/17/2022 <br />Extension of date/time by previous change orders 0 days <br />Date/time extension by this change order 0 days <br />New completion date/time 05/17/2022 <br />RECOMMENDED FOR APPROVAL <br />CONTRACTOR Construction Manager <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />Approved Date: ______________ Contractor Signature <br />Printed Name and Title <br />Bowen Engineering Corporation <br />Elizabeth A. Maradik, President <br />Company name <br />8802 North Meridian Street <br />Gary A. Gilot, Member <br />Address <br />Indianapolis, IN 46260 <br />Jordan V. Gathers, Member <br />City, State, Zip Joseph R. Molnar, Member <br />Nick Isenhower, Project Engineer <br />Nick Isenhower <br />Murray L. Miller, Member <br />04-28-2021 <br />May 11, 2021
The URL can be used to link to this page
Your browser does not support the video tag.