Laserfiche WebLink
Page 1 of 2 <br /> 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com <br />March 30, 2021 <br />(E-Mail) <br />Benjamin Burroughs <br />Water Resource Engineer <br />Arcadis U.S., Inc. <br />150 West Market Street Suite 278 <br />Indianapolis, IN 46204 <br />RE: South Bend WWTP Upgrades <br />Bowen Project #15-21-008 <br />RE: RFQ-002E – Clarifier 4 & 5 Steel Embed Plate Coating <br />Dear Mr. Burroughs: <br />Bowen Engineering Corporation (BEC) is pleased to provide you with pricing on the requested epoxy coating of <br />the existing steel embedded plates at clarifiers 4 & 5. This proposal pertains only to the 19 areas around each tank <br />for a total of 38 locations in clarifiers 4 & 5. This pricing is inclusive of all subcontractor, Labor, Equipment, and <br />Materials to complete the work as outlined in the RFQ. <br />Labor/Equipment: $10,702.96 <br />Material/Sub: $28,990.00 <br />15% Markup: $1,851.44 <br />5% Markup Sub: $1,367.50 <br />Bonds/Insurance: $472.03 <br />Total Price: $43,383.9 3 <br />Forty Three Thousand Three Hundred Eighty Three Dollars and Ninety Three Cents <br />Clarifications/Scope of Work <br />- Embedded plate surface will be abrasive blasted in accordance with SSPC-SP10 (near white metal) <br />- Two (2) full coats of Sikagard-62 will be applied only to plate outside surface <br />- No concrete modifications around plate in any kind are included <br />- Removal of embedded plates is not included <br />- Removal of embedded anchors/studs is not included <br />- Any lead based paint and asbestos is not included <br />- No overtime has been included <br />- Appropriate time extension shall be provided to Bowen <br />- Any modifications/removal of embedded plate shall be T&M <br />- Blasting/Epoxy of embedded plates around drop box is included <br />- This proposal assumes conditions and quantities of Clarifier 5 are similar to that of Clarifier 4