Laserfiche WebLink
Fellows Street Drainage Design <br /> December 10,2012 JFNow f0 <br /> FNew <br /> TASK 3: DRAINAGE DESIGN <br /> As noted in the modeling scope description, the runoff-conveyance model will help us develop an integrated <br /> solution to the drainage issues on Fellows Street. Currently, CBA has done runoff calculations to estimate runoff for <br /> the Fellows-Ireland intersection and to size inlets along the intersection. Our modeling will link all contributing areas <br /> —street runoff from Fellows, Ireland, Walter, Barbie and Chippewa and any other areas that ultimately contribute <br /> drainage to these streets into one model.The modeling will help us select and properly size the Best Management <br /> Practices (BMPs)for each problem area. <br /> Although we have not pre-selected the BMPs per se,we are prepared to recommend and/or design vegetated <br /> swales, bioretention basins, rain gardens, permeable paving systems, drywells, and so on, as needed. Our <br /> proposed design sequence will be to develop/help develop concept designs for Part 1 and 2 of design; establish <br /> buy-in and/or revise as needed.Test designs with our proposed conditions model and revise again as needed. Our <br /> drainage designs will meet or exceed City standards for runoff control and conveyance. <br /> Subtasks include: <br /> a. Part 1:Assist CBA with Fellows/Ireland intersection drainage design <br /> b. Part 2: Drainage design outside of Fellows/Ireland intersection <br /> c. Proposed conditions model <br /> d. Concept Designs <br /> Deliverables: <br /> 1. Part 1 Concept Design sketches <br /> 2. Part 2 Concept Design sketches <br /> TASK 4: CONSTRUCTION DOCUMENTS <br /> For Part 1, advising on the CBE intersection design, we have assumed CBE will develop the construction <br /> documents and that we will provide drainage design advice.This scope and budget includes our submittal of <br /> sketches, some limited details in CAD and sample specifications for Part 1 to CBE. <br /> For Part 2, we have assumed that as the design engineer, we will deliver the entire design documentation for the <br /> Fellows Street problem areas outside of the Fellows-Ireland intersection.We have also assumed that we will deliver <br /> the Part 2 design deliverables both in hardcopy and electronic format(CAD and WORD documents).The electronic <br /> format will allow CBE to efficiently incorporate our design into their complete construction documents.We will also <br /> include an engineer's estimate of costs for our Part 2 design. Lastly, we will provide a maintenance plan to the City <br /> for the BMPs that we design on this project. <br /> Subtasks include: <br /> a. 50%design drawings <br /> b. 95%design drawings <br /> c. Final construction documents <br /> d. Maintenance Plan <br /> Deliverables: <br /> 1. Part 1—concept drawings, example details and specifications <br /> 2. Part 2—50%design drawings, hardcopy and CAD files <br /> 3. Part 2—95%design drawings, hardcopy and CAD files <br /> 4. Part 2— 100% design drawings, hardcopy and CAD files <br /> 5. Part 2—specifications <br /> 6. Part 2—Engineer's estimate of costs <br /> 7. Part 1 and Part 2— Maintenance plans <br /> 8. <br /> File#0811208.00 www.cardnojfnew,com <br />