Laserfiche WebLink
Fellows Street Drainage Design ( CArcina <br /> December 10,2012 V JFNew <br /> WORK SCOPE <br /> We have divided our proposed scope into two parts — Part 1: assisting Christopher Burke Engineering (CBE)with <br /> drainage design for the Fellows Street—Ireland Road intersection and Part 2: drainage design in areas outside of <br /> the Fellows-Ireland intersection that contribute to drainage problems on Fellows Street.The drainage problem <br /> areas as we understand them include 1)the intersection of Fellows Street and Walter Street, 2)on Fellows Street <br /> just south of the intersection of its intersection with Barbie Street and 3)at the intersection of Fellows and <br /> Chippewa Avenue. <br /> For Part 1, we have assumed that we will work like a sub-consultant to CBE (though contracted through the City of <br /> South Bend), helping them develop a drainage solution for the Fellows-Ireland intersection design that is <br /> acceptable both to the City of South Bend (the City)and neighborhood residents. We will provide assistance with <br /> conceptual drainage design and details and specifications as needed, but the final construction documents remain <br /> CBE's responsibility. For Part 2 we have assumed that we will work as the primary design engineer;that is, the <br /> design will be prepared and stamped by Cardno JFNew. But we will prepare our drawings and specifications so <br /> they can be efficiently incorporated into the overall CBE bid package for the larger project. <br /> TASK 1: PROJECT COORDINATION <br /> This task covers our effort to coordinate with the City and with CBE.This includes correspondence on an on-going <br /> basis and face to face meetings.We have assumed at least one more meeting with the City and CBE and at least <br /> one meeting with stakeholders in the Fellows Street neighborhood. <br /> Subtasks include: <br /> a. Coordination with CBE and City of South Bend <br /> b. Stakeholder Meeting(s) <br /> Deliverables: <br /> 1. Project slides for stakeholder meeting(s) <br /> TASK 2: HYDROLOGIC/HYDRAULIC MODELING <br /> We will develop an explicit model of runoff and conveyance existing conditions for the entire drainage area that <br /> contributes runoff to the Fellows Street problem areas.The model will include runoff from the Fellows-Ireland <br /> intersection, the runoff contributions from Walters, Barbie and Chippewa Streets as well as all the runoff generated <br /> in and along Fellows Street. Model results will feed into the design process(TASK 3 below). We will also develop a <br /> proposed conditions model that incorporates the various design elements, so that the runoff control provided by <br /> each design element is accounted for in the design of"downstream" runoff controls. <br /> Subtasks include: <br /> a. Compile GIS/CAD coverages <br /> b. Delineate drainage areas <br /> c. Prepare existing conditions model <br /> d. Prepare proposed conditions model(following Task 3.d. below) <br /> Deliverables: <br /> 1. Existing and proposed conditions model input and output files <br /> 2. Brief technical memorandum on model results <br /> File#0811208.00 www.cardnojfnew.com <br />