My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E2
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
12-13-12 Packet
>
6E2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:21:53 PM
Creation date
12/10/2012 4:27:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fellows Street Drainage Design <br /> December 10,2012 JFNewno <br /> IVew <br /> Project Component Cost Basis Estimated Cost <br /> Project Coordination, Hydrologic/Hydraulic Modeling, Time and Materials not <br /> $35,484.00 <br /> Drainage Design, Construction Documents to Exceed <br /> Respectfully su mitted by: <br /> iyan Allison <br /> Cardno JFNew <br /> 708 Roosevelt Road <br /> Walkerton, IN 46574 <br /> Phone: 574-586-3400 Fax: 574-586-3400 <br /> Web:www.cardnojfnew.com <br /> File#0811208.00 www.cardnojfnew.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.