Laserfiche WebLink
REGULAR MEETING DECEMBER 17, 2020 232 <br />motion that the recommendation be accepted, and the quotation be awarded, and the contract <br />approved as outlined above. Mr. Molnar seconded the motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — TRIUMPH COURT LIGHTING <br />ADDITION — PROJECT NO. 120-006E (PR-00003680) <br />Mr. Finnian Cavanaugh, Engineering, advised the Board that on December 8, 2020, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Mr. Cavanaugh recommended that the Board award the contract to the lowest responsive and <br />responsible quoter, Martell Electric, LLC, 4601 Cleveland Rd., South Bend, IN 46628, in an <br />amount not to exceed $37,696.80. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted, and the quotation be awarded, and the contract approved as <br />outlined above. Mr. Molnar seconded the motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — WEST SIDE QUIET ZONE <br />IMPROVEMENTS MEDIAN AND CURB — PROJECT NO. 117-114A (PR-00005685) <br />Ms. Rebecca Plantz, Engineering, advised the Board that on December 8, 2020, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />quoter, Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, in the <br />amount of $32,036.16 for the Base Quote plus the Alternate. Therefore, Ms. Maradik made a <br />motion that the recommendation be accepted, and the quotation be awarded, and the contract <br />approved as outlined above. Mr. Molnar seconded the motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — CSO 035 THROTTLE PIPE <br />REPLACEMENT — PROJECT NO. 120-042 (PR-00002053) <br />Mr. Jacob Klosinski, Engineering, advised the Board that on July 14, 2020, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Klosinski recommended that the Board award the contract to the lowest responsive and <br />responsible quoter, Selge Construction Co., Inc., 2833 South I Ith. St., Niles, MI 49120, in the <br />amount of $148,787.50. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted, and the quotation be awarded, and the contract approved as outlined above. Mr. <br />Molnar seconded the motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — EAST RACE SIDEWALK <br />REPAIRS —PROJECT NO. 117-130 (PR-00005484) <br />Mr. Zach Hurst, Engineering, advised the Board that on November 24, 2020, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Hurst recommended that the Board award the contract to the lowest responsive and responsible <br />quoter, Walsh & Kelly, 24358 State Road 23, South Bend, IN 46614, in the amount of $71,670 <br />for the Base Quote only. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted, and the quotation be awarded, and the contract approved as outlined above. Mr. <br />Molnar seconded the motion, which carried by roll call. <br />AWARD OPEN MARKET CONTRACT — SOUTH BEND DAM SIGNAGE AND STAFF <br />GAGE INSTALLATION — PROJECT NO. 119-112 (PR-00005673) <br />Mr. Finnian Cavanaugh, Engineering, advised the Board that no quotes were received on the date <br />due of December 8, 2020. He stated he requested quotes on the open market to be opened on <br />December 15, 2020. Mr. Cavanaugh stated one (1) quotation was received and opened. After <br />reviewing that quotation, Mr. Cavanaugh recommended that the Board award the open market <br />contract to the sole responsive and responsible quoter, Northern Indiana Construction Company, <br />Inc., PO Box 1333, Mishawaka, IN 46546, in the amount of $71,735.00. Therefore, Ms. Maradik <br />made a motion that the recommendation be accepted, and the open market contract be awarded <br />as outlined above. Mr. Molnar seconded the motion, which carried by roll call. <br />APPROVE CHANGE ORDER NO. 1 — OLIVE STREET STATION ROOF REPAIRS — <br />PROJECT NO. 120-028 (PO-0005217) <br />Mr. Gilot advised that Mr. Zach Hurst, Engineering, has submitted Change Order No. 1 on <br />behalf of Midland Engineering Company, Inc., 52369 State Road 933 N, South Bend, IN 46637, <br />indicating the contract amount be increased by $35,480 and an additional forty-one (41) days, for <br />a new contract sum, including this Change Order, in the amount of $183,680 and a revised <br />completion date of December 31, 2020. The Board noted that this Change Order was over 20%, <br />but that the increase was due to unforeseen conditions that were discovered once the existing <br />