My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - Christopher B. Burke Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - Christopher B. Burke Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:31:46 PM
Creation date
1/12/2021 3:29:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Coal Line Trail | Page 4 <br />As one of the main corridors into downtown Elkhart, Main Street was in need of an <br />upgrade to make the street safer and more inviting. Main Street, like many city roads and <br />streets, was originally designed specifically for vehicular traffic. The city wanted to design <br />improvements to help make the corridor more accessible and beautiful. <br />The Burke team worked with the city to devise a phased construction approach, giving the <br />city the option to implement projects as the funds became available. The improvements <br />will provide better access to the homes and businesses along the corridor, as well as safer <br />pedestrian facilities. The team incorporated green infrastructure practices to address the <br />localized drainage issue, providing environmentally-friendly solutions that will last well into <br />the future. <br />PROJECT HIGHLIGHTS <br />• Topographic survey <br />• Geotechnical investigation <br />• Community engagement <br />• Concept development <br />• Design <br />• Rule 5 Permit <br />• Bidding assistance <br />CLIENT <br />City of Elkhart <br />Jeff Schaffer <br />574.293.2572 <br />TIME PERIOD <br />2017 - Present <br />PROJECT TEAM <br />Jason Durr <br />Mike Carey <br />Andy Gebhard <br />Matt Derucki <br />SOUTH MAIN STREET STREETSCAPE IMPROVEMENTS | ELKHART, IN <br />RELEVANT PROJECT EXPERIENCE
The URL can be used to link to this page
Your browser does not support the video tag.