My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - Christopher B. Burke Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - Christopher B. Burke Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:31:46 PM
Creation date
1/12/2021 3:29:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Coal Line Trail | Page 3 <br />RELEVANT PROJECT EXPERIENCE <br />The city of South Bend sought to create a connection between communities on the west <br />side of the city with the popular trail along the Saint Joseph River downtown. Boland Drive <br />was historically dangerous for pedestrians and cyclists. The city turned to Burke to help <br />with the construction and project management of a new trail that would increase the area’s <br />safety and connectivity. <br />The project site proved challenging, winding along wetlands and an old known pauper <br />cemetery. Through consistent progress meetings and the use of mobile workstations, <br />the project team was able to construct a new trail without disturbing the surrounding <br />environment. <br />PROJECT HIGHLIGHTS <br />• Trail construction to connect <br />communities with existing <br />downtown trail system <br />• Construction in <br />environmentally-sensitive <br />areas <br />• Construction observation and <br />project management services <br />• INDOT SiteManager <br />and mobile workstations <br />streamlined the process and <br />kept costs to a minimum <br />CLIENT <br />City of South Bend <br />Toy Villa <br />574.235.5920 <br />TIME PERIOD <br />2018 - 2019 <br />COST <br />$1,346,996 <br />PROJECT TEAM <br />Jason Durr <br />Mike Carey <br />BOLAND DRIVE SHARED-USE PATH | SOUTH BEND, IN
The URL can be used to link to this page
Your browser does not support the video tag.