Laserfiche WebLink
December 4, 2020 <br /> <br /> Page | 2 troyergroup.com | Together, We Will <br /> Assumptions <br />1. The City will provide front end specifications for incorporation with the project <br />specific specifications. <br />2. The City will investigate and provide any existing building plans and utility <br />plans for the properties impacted by the demolition to assist in investigating any <br />special conditions for demolition and impacts to the adjacent building. <br />3. Asbestos Investigation and Required Abatement Measures will be provided by <br />the City and be included in the Specifications. <br />4. Lead Paint inspection, if required, will be provided by the City <br />5. Survey services, if required, will be provided by the City. <br />6. Design for shoring of the existing bank building or facade, if determined to be <br />required, will be additional services <br /> <br />Fees <br />• The lump sum fee for the above scope of work will be $19,400 <br /> <br />Refer to the attached manhour justification for additional information on the proposed <br />scope of work. Schedule <br />We anticipate providing completed plans, specifications and damage report within <br />eight weeks of receiving notice to proceed and all readily available information <br />(existing plans, utility plans etc.). <br /> <br />Thank you again for giving us the opportunity to work with you. If you have any <br />questions concerning this proposal, please contact us. If this proposal is acceptable, <br />please sign in the space provided and return a copy to our office. <br /> <br />Sincerely, <br /> <br /> <br />_______________________________ <br />Jason M. Hickle, P.E. <br />Director of Structural Engineering <br /> <br />Accepted by: <br /> <br /> <br />Signature: _________________________________________ Date: ______________ <br /> <br /> <br />