My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for Demolition of Three (3) Buildings at 905, 907 and 909 S. Michigan St. – Troyer Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for Demolition of Three (3) Buildings at 905, 907 and 909 S. Michigan St. – Troyer Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 1:19:03 PM
Creation date
12/18/2020 1:18:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br />909 Michigan St. Bldg Demolition <br />Design Manhour Justification <br />December 4, 2020 <br />Project 20155.00 <br />WORK ITEM President Director Struct. <br />Eng. <br />Struct. <br />Eng. <br />Assoc. <br />Landsca <br />pe <br />Design <br />Assoc. <br />Landsca <br />pe proj. <br />Mgr <br />Struct. <br />Eng. Des. <br />Assoc. <br />Total <br />Labor <br />Allowable Billing Rate $225.00 $180.00 $105.00 $100.00 $85.00 $120.00 $76.00 <br />Inspection and Documentation <br />Site Visit 4 4 2 2 12 <br />Report 1 8 9 <br />Man Hours Subtotal 0 1 12 4 2 2 0 21 <br />Labor Cost $0 $180 $1,260 $400 $170 $240 $0 $2,250 <br />Demolition Plans <br />Existing Bldg Plan Investigation 1 16 17 <br />Demo Plan 1 8 8 3 6 26 <br />Site/Grading Plan 8 3 2 13 <br />Details 8 8 2 8 26 <br />MOT plans 2 6 2 2 12 <br />Erosion Control Plans (Enviro)2 6 2 2 12 <br />Utility Coordination 4 <br />Man Hours Subtotal 0 2 36 4 36 12 20 110 <br />Labor Cost $0 $360 $3,780 $400 $3,060 $1,440 $1,520 $10,560 <br />Specification Development <br />Specification Development 4 12 2 4 22 <br />Coordination with City 8 2 10 <br />Asbestos Report 2 2 <br />Misceallaneous <br />Project Management 2 2 <br />QA/QC 4 4 <br />Man Hours Subtotal 0 10 22 0 2 6 0 40 <br />Labor Cost $0 $1,800 $2,310 $0 $170 $720 $0 $5,000 <br />Project Man Hours Total 0 13 70 8 40 20 20 171 <br />Labor Cost $0 $2,340 $7,350 $800 $3,400 $2,400 $1,520 $17,810 <br />Additional Services <br />Drone Investigation and Documentation 4 4 4 4 <br />Man Hours Subtotal 0 0 0 4 4 4 4 0 <br />Labor Cost $0 $0 $0 $400 $340 $480 $304 $1,524 <br /> <br />Reimbursable Expenses $100 <br />TOTAL MAX FEE $19,400 <br />G:\projects\PS\SouthBnd\20155-00 909 S Michigan St Bldg Demo\Copy of 909 Mich Bldg Demo Fee Design Budget Building Printed: 12/4/2020
The URL can be used to link to this page
Your browser does not support the video tag.