BID TABULATIONProject NameProject No: B-16 Pipe, Type 4, 6 in99 LFT$10.00 $990.00 $26.29 $2,602.71 $26.16 $2,589.84B-17 Aggregates for Underdrains4 CYS$150.00 $600.00 $78.86 $315.44 $78.50 $314.00B-18 Manhole, Saddle Structure1 EACH$10,000.00 $10,000.00 $6,308.94 $6,308.94 $6,276.00 $6,276.00B-19 Casting, Type 4, Adjust to Grade 1 EACH$1,000.00 $1,000.00 $262.87 $262.87 $262.00 $262.00B-20 Gabions, Metallic Coated199 CYS$425.00 $84,575.00 $562.55 $111,947.45 $559.62 $111,364.38B-21 Pneumatically Placed Mortar1405 SFT$60.00 $84,300.00 $51.81 $72,793.05 $33.51 $47,081.55B-22 Salvaged Gabion Material, Install 108 CYS$50.00 $5,400.00 $52.57 $5,677.56 $52.31 $5,649.48B-23 Pile, Steel Pipe, 0.5 inch, 12.75 inch 400 LFT$140.00 $56,000.00 $105.15 $42,060.00 $104.60 $41,840.00B-24 Dynamic Pile Load Test, 12.75 inch 2 EACH$3,500.00 $7,000.00 $4,205.96 $8,411.92 $4,184.00 $8,368.00B-25 Structural Steel, Galvanized21,336 LBS$3.00 $64,008.00 $3.81 $81,290.16 $2.79 $59,527.44B-26 Concrete, C, Superstructure123 CYS$750.00 $92,250.00 $556.48 $68,447.04 $670.07 $82,418.61B-27 Concrete, B, Footings179 CYS$800.00 $143,200.00 $611.00 $109,369.00 $813.95 $145,697.05B-28 Composite Concrete Slab43 CYS$1,630.00 $70,090.00 $419.01 $18,017.43 $622.14 $26,752.02B-29 Concrete Topping Slab, Integral Color, Finish "A" 186 SYS$110.00 $20,460.00 $89.27 $16,604.22 $80.91 $15,049.26B-30 Concrete Topping Slab, Integral Color, Finish "B" 199 SYS$95.00 $18,905.00 $73.13 $14,552.87 $86.71 $17,255.29B-31 Sheet Pile NZ1442 TON$5,000.00 $210,000.00 $4,641.58 $194,946.36 $4,393.22 $184,515.24B-32 Threaded Tie Rod5 EACH$3,500.00 $17,500.00 $3,154.47 $15,772.35 $3,138.00 $15,690.00B-33 Wales - Double C130 LFT$150.00 $19,500.00 $215.56 $28,022.80 $214.44 $27,877.20B-34 Sheet Pile Concrete Cap65 LFT$250.00 $16,250.00 $142.69 $9,274.85 $136.94 $8,901.10B-35 Subgrade Treatment, Type III269 SYS$5.00 $1,345.00 $5.26 $1,414.94 $5.24 $1,409.56B-36 Compacted Aggregate, No. 53 31 TON$75.00 $2,325.00 $63.09 $1,955.79 $62.78 $1,946.18B-37 Concrete Walk False Joints219 LFT$2.00 $438.00 $1.30 $284.70 $4.45 $974.55B-38 Expansion Joint, Concrete Walk 67 LFT$7.50 $502.50 $6.46 $432.82 $4.45 $298.15B-39 Sidewalk Joint Transitions262 LFT$10.00 $2,620.00 $1.95 $510.90 $1.31 $343.22B-40 Unit Paver28 SYS$175.00 $4,900.00 $613.07 $17,165.96 $248.97 $6,971.16B-41 Type 5 Rail with Custom Infill Panel, 42 inch 40 LFT$350.00 $14,000.00 $456.87 $18,274.80 $489.03 $19,561.20B-42 Type 5 Rail with Custom Infill Panel, 48 inch 103 LFT$370.00 $38,110.00 $352.25 $36,281.75 $386.22 $39,780.66B-43 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 inch 77 LFT$400.00 $30,800.00 $337.98 $26,024.46 $350.49 $26,987.73B-44 Handrail20 LFT$200.00 $4,000.00 $131.44 $2,628.80 $178.90 $3,578.00B-45 Lighting, Pole, 12 ft3 EACH$2,350.00 $7,050.00 $5,301.27 $15,903.81 $5,273.67 $15,821.01B-46 Foundation, Lighting3 EACH$1,500.00 $4,500.00 $1,412.85 $4,238.55 $1,669.67 $5,009.01B-47 Luminaire, Type L1A 3 EACH$3,350.00 $10,050.00 $4,377.71 $13,133.13 $4,355.00 $13,065.00B-48 Luminaire, Type L137 EACH$1,000.00 $7,000.00 $1,119.84 $7,838.88 $1,113.86 $7,797.02B-49 Handhole, Lighting3 EACH$800.00 $2,400.00 $1,101.61 $3,304.83 $1,096.34 $3,289.02B-50 PVC Conduit, 0.75 inch325 LFT$5.00 $1,625.00 $5.96 $1,937.00 $5.93 $1,927.25B-51 PVC Conduit, 1.5 inch225 LFT$6.25 $1,406.25 $6.71 $1,509.75 $6.68 $1,503.00B-52 PVC Conduit, 2 inch25 LFT$6.60 $165.00 $8.75 $218.75 $8.68 $217.00B-53 Crescent Lights Adjustments1 LSUM$10,000.00 $10,000.00 $5,690.67 $5,690.67 $5,661.00 $5,661.00B-54 Wire, 3#6, No 6 AWG, Stranded Copper 375 LFT$3.00 $1,125.00 $7.00 $2,625.00 $6.96 $2,610.00B-55 Wire, 2#12, No 12AWG, Solid Copper 325 LFT$1.50 $487.50 $2.26 $734.50 $2.25 $731.25B-56 Excelsoir Blanket221 SYS$3.50 $773.50 $2.63 $581.23 $2.88 $636.48B-57 Shredded Hardwood Mulch12 CYS$85.00 $1,020.00 $78.86 $946.32 $86.34 $1,036.08B-58 Deciduous Tree, 2.5 inch caliper 6 EACH$500.00 $3,000.00 $578.32 $3,469.92 $632.84 $3,797.04B-59 Coniferous Shrubs, No. 3 Cont 59 EACH$55.00 $3,245.00 $52.57 $3,101.63 $57.55 $3,395.45https://smithgroup4.sharepoint.com/sites/PRJ‐90597‐001/Shared Documents/001/CA/Bid/Bid Summary/2020‐1130 Seitz Bid Summary.xlsx
|