My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - North Shore Drive Bank Stabilization Proj No. 118-005A - The Stanger Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - North Shore Drive Bank Stabilization Proj No. 118-005A - The Stanger Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 4:11:56 PM
Creation date
12/8/2020 4:10:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
wall with erosion control blankets and plant material. Work also included <br />planting of 153 woody plants, 384 live stakes and 2,786 plant plugs. <br />YContract Amount: $349,000 <br />2. Attach a listing of public works projects currently In process of construction by your <br />organization. <br />a. None. <br />3. Attach information regarding any failure to complete any work awarded to you and the <br />location thereof. <br />a. None. <br />4. Attach references from private firms for which you have performed work. <br />a. Lvn Crighton. Executive Director of The Watershed Foundation (TNF <br />3w Phone: <br />(574) 265-8323 <br />➢E-mail: <br />Il waterchedfoundation.org <br />b. Debbie Palmer. <br />President of Lake Maxinkuckee Environmental Council <br />l -Phone: <br />(574)842-3686 <br />).,E-mail: <br />ImecPlakemax.org <br />c. Bridget Harrison Executive Director of Clear Lake Township Land Conservancy (CLTLC) <br />➢Phone: <br />(260)527-1072 <br />LE -mall: <br />bridget.harrison(aclearlakeconservancy.org <br />d. Heather Harwood. Director at Wawasee Area Conservancy Foundation (WACF) <br />)i- Phone: <br />(574)457-4549 <br />YE -mail: <br />info(Dwacf.com <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />1. Attach an explanation of your plan or layout for performing proposed work. <br />The following is the construction process we intend on following to complete the North Shore <br />Drive Bank Stabilization project. <br />1. Call on Utilities to be marked prior to any on site activity. <br />2. If Covid guidelines allow, SLEG will hold a preconstruction meeting on site with <br />subcontractors and a representative from the City of South Bend. <br />3. Perform any necessary construction layout. <br />4. Traffic control measures will be put in place for the duration of the project. <br />S. Mobilize small rubber tracked equipment and access mats to be set in place. <br />
The URL can be used to link to this page
Your browser does not support the video tag.