Laserfiche WebLink
wall with erosion control blankets and plant material. Work also included <br />planting of 153 woody plants, 384 live stakes and 2,786 plant plugs. <br />YContract Amount: $349,000 <br />2. Attach a listing of public works projects currently In process of construction by your <br />organization. <br />a. None. <br />3. Attach information regarding any failure to complete any work awarded to you and the <br />location thereof. <br />a. None. <br />4. Attach references from private firms for which you have performed work. <br />a. Lvn Crighton. Executive Director of The Watershed Foundation (TNF <br />3w Phone: <br />(574) 265-8323 <br />➢E-mail: <br />Il waterchedfoundation.org <br />b. Debbie Palmer. <br />President of Lake Maxinkuckee Environmental Council <br />l -Phone: <br />(574)842-3686 <br />).,E-mail: <br />ImecPlakemax.org <br />c. Bridget Harrison Executive Director of Clear Lake Township Land Conservancy (CLTLC) <br />➢Phone: <br />(260)527-1072 <br />LE -mall: <br />bridget.harrison(aclearlakeconservancy.org <br />d. Heather Harwood. Director at Wawasee Area Conservancy Foundation (WACF) <br />)i- Phone: <br />(574)457-4549 <br />YE -mail: <br />info(Dwacf.com <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />1. Attach an explanation of your plan or layout for performing proposed work. <br />The following is the construction process we intend on following to complete the North Shore <br />Drive Bank Stabilization project. <br />1. Call on Utilities to be marked prior to any on site activity. <br />2. If Covid guidelines allow, SLEG will hold a preconstruction meeting on site with <br />subcontractors and a representative from the City of South Bend. <br />3. Perform any necessary construction layout. <br />4. Traffic control measures will be put in place for the duration of the project. <br />S. Mobilize small rubber tracked equipment and access mats to be set in place. <br />