Laserfiche WebLink
City of South Bend, Indiana <br />North Shore Drive Bank Stabilization <br />PART II <br />SECTION I EPERIENCE QUESTIONNAIRE <br />1. Attach information regarding projects your organization has completed for a period of 1 -year <br />prior to the date of current bid. <br />a. Lone Point Tree <br />,Client: Lake James Association <br />'r Restore 560' of shoreline on Lake James located in Angola, Indiana with a bio- <br />engineered seawall constructed of glacial stone. <br />YContract Amount: $43,900 <br />b. Kline Island—Phase 111 <br />),,Client: Indiana Annual Conference of the UMC, Inc. <br />➢Restore 300' shoreline at Kline Island located on Webster Lake in North <br />Webster, Indiana with a bio -engineered sea wall. We utilized barges to <br />transport glacial stone and other materials from a shoreline staging area to the <br />island. Stone was set in place with an excavator sitting on our barges. <br />➢Contract Amount: $46,574 <br />c. Sugar Creek Stream Bank Stabilization <br />YClient: Vigo County Parks Department <br />>Restore and stabilize approximately 140' of stream bank with glacial stone, <br />encapsulated lifts, grade structures and installation of native plant material. <br />Y Contract Amount: $87,150 <br />d. DRG Fecon and Silt Fence. <br />YClient: Davey's Resource Group <br />Y Forestry removal of approximately 20 acres with fecons and installation of <br />27,000 LF of silt fence. <br />YContract Amount: $105,900 <br />e. Kline Wetland Levee Restoration <br />YClient: Lake Maxinkuckee Environmental Council <br />'v Reconstructed a 1,680 LF levee that had failed due to settling and muskrat <br />damage by placing geogrid and fill material to specified height. An animal <br />barrier was installed on the side slopes to prevent further muskrat damage and <br />a stop log grade control structure was also installed with emergency spill way to <br />control water depth. <br />YContract Amount: $430,000 <br />I. Bloomingdale Park —Phase 1 <br />➢Client: City of Fort Wayne <br />Y Riverbank restoration project including toe wall construction at base of river <br />bank with shot rock, riprap and glacial stone, bank stabilization above the tow <br />