My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - North Shore Drive Bank Stabilization Proj No. 118-005A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - North Shore Drive Bank Stabilization Proj No. 118-005A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 4:08:36 PM
Creation date
12/8/2020 4:06:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. There is a large tree that has fallen into the water on the site. The root ball is still partially in the <br />riverbank. Is the tree and root ball to be removed and if so, will it need to be replaced? <br />A: An approximately 18" DBH Sycamore tree has fallen into the river since the issuance of these <br />bid documents. The entirety of the tree, including rootball, will be removed from the site and <br />this additional work should be included in the unit price for Clearing, Grubbing, and Obstruction <br />Removal. The void left by the tree should be backfilled with INDOT Class I Riprap. The current <br />quantity of INDOT Class I Riprap included on the bid sheet should be considered sufficient to fill <br />this void and still complete all other designated bank stabilization work. <br />12. May we substitute live stakes in lieu of bare root shrubs because planting time is out of season. <br />We recommend doubling live stake quantity as survival rate is not as great. <br />A: Should installation of plantings take place prior to spring availability of bare roots or as <br />approved by the Owner, native species live stakes installed at a 3:1 ratio may substitute bare <br />root plantings. <br />13. Will the overhead utility line be relocated before construction begins? Or will line protection be <br />required? <br />A: The overhead utility line will be relocated to the north side of North Shore Drive prior to <br />construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.