My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.B.(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
10-25-12 Packet
>
6.B.(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:13:14 PM
Creation date
10/30/2012 1:02:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TBE rf ROYER GROUP <br />550 Union St. Mishawaka, IN 46544 <br />or_-= (574) 259 -9976 wwwAroyergroupxom <br />r� ", <br />OWNER. / ARCHITECT <br />AGREEMENT CHANGE NOTICE <br />Change No,: 001 <br />Project Name: City of South Bend Memorial Hosoital Facades Proiect City Proleet No 112 -018 Date: October 16 ,1012 <br />Client, City of South Fiend Conunouity & Economic Development Project No.: i 1136.00 <br />1. CLASSIFICATION <br />X A. Pmject Scope Change <br />X B. Revisions to Approved Arrangements <br />C. Alterations in Design Concept <br />D. Other (describe) <br />IV. <br />V <br />Vl. <br />DESCRIPTION <br />Redesign of the tower element on the project due to in place utilities /as -built conditions. The design work included developing <br />three options, pr renting them to the Owner /Contractor Team, revising the existing documents issuing them in the form of a <br />Proposal request for pricing and construction and review of new shop drawings and submittals related to the changes. <br />There are no additional eests for Construction Administration Services related to this work. <br />Reimbursables for this work will be covered via the original agreement. <br />RFASONS FOR CHANGE <br />Existing utilitiesrabuih conditions encountered which were not documented. <br />ESTIMATED IMPACT ON CONSTRUCTION COSTS - (Actual) (Minimum) (Maximum) <br />It is estimated that these changes will reduce construction costs. <br />Increase (Decrease) <br />CONTRACT MODIFICATIONS <br />The original Services Fee was <br />The Services Fee prior h) this Change Order was <br />The Services Fee will beg� (decreased) (unchanged) by this Change Order <br />The new Services Fee including this Change Order will be <br />S <br />S f 19,250.00 <br />S <br />119,250.01) <br />5 3.500.00 <br />S 122.750. W <br />ESTIMATED IMPACT ON DESIGN &DOCUMENTATION TIME <br />(9 (Subtract) (Design was completed and issued September 27, 2012) <br />Not Valid until signed by both Owner and Architect. <br />Authorized: <br />The Troyer Group, hic. <br />Architect <br />By: Andrew S. Roche, AIA <br />Date: October 16.2012 <br />Authorized: <br />Rwner/CHent <br />9y: _ <br />Date: <br />G: J'rojeras'JlCMemorie! Hwpuel �.1! 136- IX)'proJert- inlh�34- ehmrge'charcge -1X11 _16oarl2.dor <br />
The URL can be used to link to this page
Your browser does not support the video tag.